Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2006
Principal Product color formers
NAICS 325130 - Synthetic Dye and Pigment Manufacturing
SIC 2865 - Cyclic Crudes And Intermediates
Sales $10,000,000-$50,000,000
# of Employees 79
Plant Area (Sq.Ft.) 40,500
Annual Production 3,300,000 Pounds
Production Hrs. Annual 8,400
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $302,127 8,325,676 kWh $0.04
Electricity Demand $151,779 15,949 kW-months/year $9.52
Electricity Fees $3,726 - $ -
Natural Gas $538,934 57,398 MMBtu $9.39
TOTAL ENERGY COSTS $996,566
RECOMMENDED SAVINGS* $49,078 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,850
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,385
Cost:
$2,500
- - - - $12,385 1,319 -
-
kWh
-
-
kW-months/year
$12,385
1,319
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$11,812
Cost:
$22,458
- - - - $11,812 1,258 -
-
kWh
-
-
kW-months/year
$11,812
1,258
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,934
Cost:
$2,500
- - $9,934 1,058 - - -
-
kWh
$9,934
1,058
kW-months/year
-
-
MMBtu
04: 2.2525 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA Savings:
$8,336
Cost:
$7,520
$2,072 57,084 $776 82 $5,488 584 $2,072
57,084
kWh
$776
82
kW-months/year
$5,488
584
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,571
Cost:
$9,421
$1,604 44,198 $967 102 - - $1,604
44,198
kWh
$967
102
kW-months/year
-
-
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,482
Cost:
$2,429
- - - - $2,482 284 -
-
kWh
-
-
kW-months/year
$2,482
284
MMBtu
07: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,558
Cost:
$197
- - - - $1,558 166 -
-
kWh
-
-
kW-months/year
$1,558
166
MMBtu
TOTAL RECOMMENDED Savings:
$49,078
Cost:
$47,025
$3,676 101,282 $11,677 1,242 $33,725 3,611 $3,676
101,282
kWh
$11,677
1,242
kW-months/year
$33,725
3,611
MMBtu
TOTAL IMPLEMENTED Savings:
$24,850
Cost:
$19,638
$3,676 101,282 $1,743 184 $19,431 2,069 $3,676
101,282
kWh
$1,743
184
kW-months/year
$19,431
2,069
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas