Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2006 |
Principal Product | Plastic Injection Molded Parts |
NAICS | 326121 - Unlaminated Plastics Profile Shape Manufacturing |
SIC | 3089 - Plastics Products, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 455 |
Plant Area (Sq.Ft.) | 200,000 |
Annual Production | 60,000,000 Pieces |
Production Hrs. Annual | 6,000 |
Location (State) | OH |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $541,630 | 15,109,279 | kWh | $0.04 |
Electricity Demand | $532,732 | 31,285 | kW-months/year | $17.03 |
Electricity Fees | $23,567 | - | $ | - |
Natural Gas | $244,653 | 21,905 | MMBtu | $11.17 |
TOTAL ENERGY COSTS | $1,342,582 | |||
RECOMMENDED SAVINGS* | $105,093 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $35,617 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Solid Waste (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | lb | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $31,460 Cost: $21,337 |
$16,133 | 450,000 | $15,327 | 900 | - | - | - | - | - | - |
$16,133 450,000 kWh |
$15,327 900 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.6122 INSTALL SOLID WASTE INCINERATOR FOR HEAT |
Savings: $30,322 Cost: $27,325 |
- | - | - | - | - | - | $16,822 | 8,411 | $13,500 | 560,000 |
- - kWh |
- - kW-months/year |
- - MMBtu |
$16,822 8,411 MMBtu |
$13,500 560,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $20,000 Cost: $14,850 |
$(-609) | (-16,994) | $(-540) | (-32) | $21,149 | 1,893 | - | - | - | - |
$(-609) (-16,994) kWh |
$(-540) (-32) kW-months/year |
$21,149 1,893 MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $10,978 Cost: $375 |
$5,652 | 157,440 | $5,326 | 315 | - | - | - | - | - | - |
$5,652 157,440 kWh |
$5,326 315 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $7,694 Cost: $2,000 |
$3,946 | 110,053 | $3,748 | 220 | - | - | - | - | - | - |
$3,946 110,053 kWh |
$3,748 220 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,785 Cost: $5,996 |
$1,428 | 43,620 | $1,357 | 87 | - | - | - | - | - | - |
$1,428 43,620 kWh |
$1,357 87 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,854 Cost: $225 |
$951 | 26,518 | $903 | 53 | - | - | - | - | - | - |
$951 26,518 kWh |
$903 53 kW-months/year |
- - MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $105,093 Cost: $72,108 |
$27,501 | 770,637 | $26,121 | 1,543 | $21,149 | 1,893 | $16,822 | 8,411 | $13,500 | 560,000 | $27,501 770,637 kWh |
$26,121 1,543 kW-months/year |
$21,149 1,893 MMBtu |
$16,822 8,411 MMBtu |
$13,500 560,000 lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $35,617 Cost: $21,446 |
$7,422 | 210,584 | $7,046 | 423 | $21,149 | 1,893 | - | - | - | - | $7,422 210,584 kWh |
$7,046 423 kW-months/year |
$21,149 1,893 MMBtu |
- - MMBtu |
- - lb |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | MMBtu | $ | lb | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Solid Waste (non-haz) | Electricity Usage | Electricity Demand | Natural Gas | Other Energy | Solid Waste (non-haz) |