Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2006 |
Principal Product | Bakery Mixes |
NAICS | 311824 - Dry Pasta, Dough, and Flour Mixes Manufacturing from Purchased Flour |
SIC | 2045 - Prepared Flour Mixes And Doughs |
Sales | $50,000,000-$100,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 240,000 |
Annual Production | 162,000,000 Pounds |
Production Hrs. Annual | 6,240 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $119,976 | 3,255,369 | kWh | $0.04 |
Electricity Demand | $71,592 | 7,502 | kW-months/year | $9.54 |
Electricity Fees | $8,210 | - | $ | - |
Natural Gas | $55,670 | 6,742 | MMBtu | $8.26 |
TOTAL ENERGY COSTS | $255,448 | |||
RECOMMENDED SAVINGS* | $53,035 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,885 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $15,410 Cost: $500 |
$10,288 | 279,190 | $5,122 | 537 | - | - |
$10,288 279,190 kWh |
$5,122 537 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED |
Savings: $14,289 Cost: $4,200 |
$14,289 | 387,764 | - | - | - | - |
$14,289 387,764 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $8,355 Cost: $15,984 |
$5,578 | 151,372 | $2,777 | 291 | - | - |
$5,578 151,372 kWh |
$2,777 291 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $6,421 Cost: $100 |
$4,287 | 116,329 | $2,134 | 224 | - | - |
$4,287 116,329 kWh |
$2,134 224 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $1,885 Cost: $2,250 |
$(-97) | (-2,632) | $(-46) | (-5) | $2,028 | 245 |
$(-97) (-2,632) kWh |
$(-46) (-5) kW-months/year |
$2,028 245 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,862 Cost: $200 |
$1,862 | 50,524 | - | - | - | - |
$1,862 50,524 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,826 Cost: $1,300 |
- | - | - | - | $1,826 | 221 |
- - kWh |
- - kW-months/year |
$1,826 221 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,622 Cost: $800 |
$1,116 | 30,307 | $506 | 53 | - | - |
$1,116 30,307 kWh |
$506 53 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $857 Cost: $300 |
$857 | 23,266 | - | - | - | - |
$857 23,266 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $508 Cost: $276 |
$508 | 13,778 | - | - | - | - |
$508 13,778 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $53,035 Cost: $25,910 |
$38,688 | 1,049,898 | $10,493 | 1,100 | $3,854 | 466 | $38,688 1,049,898 kWh |
$10,493 1,100 kW-months/year |
$3,854 466 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,885 Cost: $2,250 |
$(-97) | (-2,632) | $(-46) | (-5) | $2,028 | 245 | $(-97) (-2,632) kWh |
$(-46) (-5) kW-months/year |
$2,028 245 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |