Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2007 |
Principal Product | flexible and rigid foam |
NAICS | 326150 - Urethane and Other Foam Product (except Polystyrene) Manufacturing |
SIC | 3086 - Plastics Foam Products |
Sales | $10,000,000-$50,000,000 |
# of Employees | 176 |
Plant Area (Sq.Ft.) | 58,000 |
Annual Production | 5,600,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $304,006 | 4,276,400 | kWh | $0.07 |
Electricity Demand | $78,884 | 7,204 | kW-months/year | $10.95 |
Electricity Fees | $7,174 | - | $ | - |
Natural Gas | $99,054 | 9,946 | MMBtu | $9.96 |
TOTAL ENERGY COSTS | $489,118 | |||
RECOMMENDED SAVINGS* | $121,835 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $73,562 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $56,621 Cost: $14,400 |
$45,054 | 633,762 | $11,567 | 1,056 | - | - |
$45,054 633,762 kWh |
$11,567 1,056 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7314 REDUCE VENTILATION AIR |
Savings: $22,071 Cost: $17,000 |
- | - | - | - | $22,071 | 2,216 |
- - kWh |
- - kW-months/year |
$22,071 2,216 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $12,908 Cost: $3,000 |
- | - | - | - | $12,908 | 1,296 |
- - kWh |
- - kW-months/year |
$12,908 1,296 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $9,212 Cost: - |
- | - | - | - | $9,212 | 903 |
- - kWh |
- - kW-months/year |
$9,212 903 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $7,856 Cost: $4,379 |
$7,856 | 86,334 | - | - | - | - |
$7,856 86,334 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $7,729 Cost: $1,620 |
- | - | - | - | $7,729 | 776 |
- - kWh |
- - kW-months/year |
$7,729 776 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,586 Cost: $2,640 |
$1,829 | 25,726 | $757 | 69 | - | - |
$1,829 25,726 kWh |
$757 69 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $2,151 Cost: $1,000 |
$1,553 | 21,840 | $598 | 55 | - | - |
$1,553 21,840 kWh |
$598 55 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $701 Cost: $400 |
$558 | 7,849 | $143 | 13 | - | - |
$558 7,849 kWh |
$143 13 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $121,835 Cost: $44,439 |
$56,850 | 775,511 | $13,065 | 1,193 | $51,920 | 5,191 | $56,850 775,511 kWh |
$13,065 1,193 kW-months/year |
$51,920 5,191 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $73,562 Cost: $16,020 |
$45,054 | 633,762 | $11,567 | 1,056 | $16,941 | 1,679 | $45,054 633,762 kWh |
$11,567 1,056 kW-months/year |
$16,941 1,679 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |