IAC logo
IAC Assessment: UM0331
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0331
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2007
Principal Product Carbide Pre-Form Cutting Tools
NAICS 333517 - Machine Tool Manufacturing
SIC 3545 - Machine Tool Accessories
Sales $10,000,000-$50,000,000
# of Employees 108
Plant Area (Sq.Ft.) 37,855
Annual Production 50,500 Pieces
Production Hrs. Annual 6,120
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $185,295 3,529,691 kWh $0.05
Electricity Demand $93,899 8,830 kW-months/year $10.63
Electricity Fees $3,032 - $ -
Natural Gas $20,488 16,103 MMBtu $1.27
TOTAL ENERGY COSTS $302,714
RECOMMENDED SAVINGS* $44,569 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,752
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Gaseous Waste Electricity Usage Electricity Demand Natural Gas Gaseous Waste
$ kWh $ kW-months/year $ MMBtu $ lb
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$37,752
Cost:
$38,000
- - - - - - $37,752 146,982 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$37,752
146,982
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,146
Cost:
$12,000
$2,252 42,901 $894 84 - - - - $2,252
42,901
kWh
$894
84
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.2425 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER Savings:
$2,277
Cost:
$4,600
- - - - $2,277 179 - - -
-
kWh
-
-
kW-months/year
$2,277
179
MMBtu
-
-
lb
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$788
Cost:
$500
$565 10,763 $223 21 - - - - $565
10,763
kWh
$223
21
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$606
Cost:
-
$434 8,262 $172 16 - - - - $434
8,262
kWh
$172
16
kW-months/year
-
-
MMBtu
-
-
lb
TOTAL RECOMMENDED Savings:
$44,569
Cost:
$55,100
$3,251 61,926 $1,289 121 $2,277 179 $37,752 146,982 $3,251
61,926
kWh
$1,289
121
kW-months/year
$2,277
179
MMBtu
$37,752
146,982
lb
TOTAL IMPLEMENTED Savings:
$3,752
Cost:
$12,000
$2,686 51,163 $1,066 100 - - - - $2,686
51,163
kWh
$1,066
100
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Gaseous Waste Electricity Usage Electricity Demand Natural Gas Gaseous Waste