IAC logo
IAC Assessment: UM0339
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0339
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2008
Principal Product Metal Working Fluids, Various Oils
NAICS 324191 - Petroleum Lubricating Oil and Grease Manufacturing
SIC 2992 - Lubricating Oils And Greases
Sales $10,000,000-$50,000,000
# of Employees 36
Plant Area (Sq.Ft.) 60,000
Annual Production 69,500,000 Pounds
Production Hrs. Annual 4,420
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,981 1,246,372 kWh $0.07
Electricity Demand $30,605 3,045 kW-months/year $10.05
Electricity Fees $9,421 - $ -
Natural Gas $804,354 71,800 MMBtu $11.20
TOTAL ENERGY COSTS $933,361
RECOMMENDED SAVINGS* $334,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$136,461
Cost:
$172,800
- - - - $136,461 12,184 -
-
kWh
-
-
kW-months/year
$136,461
12,184
MMBtu
02: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$108,562
Cost:
$15,000
- - - - $108,562 9,693 -
-
kWh
-
-
kW-months/year
$108,562
9,693
MMBtu
03: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$42,258
Cost:
$4,000
- - - - $42,258 3,773 -
-
kWh
-
-
kW-months/year
$42,258
3,773
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$25,917
Cost:
$2,600
- - - - $25,917 2,314 -
-
kWh
-
-
kW-months/year
$25,917
2,314
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$15,086
Cost:
$2,540
- - - - $15,086 1,347 -
-
kWh
-
-
kW-months/year
$15,086
1,347
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,808
Cost:
$682
- - - - $3,808 340 -
-
kWh
-
-
kW-months/year
$3,808
340
MMBtu
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,808
Cost:
$4,620
$2,024 19,466 $784 78 - - $2,024
19,466
kWh
$784
78
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$334,900
Cost:
$202,242
$2,024 19,466 $784 78 $332,092 29,651 $2,024
19,466
kWh
$784
78
kW-months/year
$332,092
29,651
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas