IAC logo
IAC Assessment: UM0341
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0341
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2008
Principal Product Recycled Boxboard
NAICS 322130 - Paperboard Mills
SIC 2631 - Paperboard Mills
Sales $10,000,000-$50,000,000
# of Employees 101
Plant Area (Sq.Ft.) 200,000
Annual Production 70,000 Tons
Production Hrs. Annual 8,400
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $852,923 39,499,200 kWh $0.02
Electricity Demand $929,560 63,600 kW-months/year $14.62
Natural Gas $1,889,489 240,625 MMBtu $7.85
Fuel Oil #6 $1,695,881 274,718 MMBtu $6.17
TOTAL ENERGY COSTS $5,367,853
RECOMMENDED SAVINGS* $245,191 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $79,804
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$101,548
Cost:
$18,088
- - - - $101,548 12,936 -
-
kWh
-
-
kW-months/year
$101,548
12,936
MMBtu
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$79,804
Cost:
$53,414
- - - - $79,804 10,166 -
-
kWh
-
-
kW-months/year
$79,804
10,166
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$31,965
Cost:
$59,142
- - - - $31,965 4,072 -
-
kWh
-
-
kW-months/year
$31,965
4,072
MMBtu
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$13,835
Cost:
$4,800
$7,032 325,722 $6,803 465 - - $7,032
325,722
kWh
$6,803
465
kW-months/year
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,572
Cost:
$5,000
- - - - $8,572 1,092 -
-
kWh
-
-
kW-months/year
$8,572
1,092
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,111
Cost:
$8,160
$3,106 143,875 $3,005 206 - - $3,106
143,875
kWh
$3,005
206
kW-months/year
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,356
Cost:
$515
$1,704 78,885 $1,652 113 - - $1,704
78,885
kWh
$1,652
113
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$245,191
Cost:
$149,119
$11,842 548,482 $11,460 784 $221,889 28,266 $11,842
548,482
kWh
$11,460
784
kW-months/year
$221,889
28,266
MMBtu
TOTAL IMPLEMENTED Savings:
$79,804
Cost:
$53,414
- - - - $79,804 10,166 -
-
kWh
-
-
kW-months/year
$79,804
10,166
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas