IAC logo
IAC Assessment: UM0350
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0350
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2009
Principal Product Excipients of Medical Capsules
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $10,000,000-$50,000,000
# of Employees 54
Plant Area (Sq.Ft.) 70,000
Annual Production 7,200,000 Pounds
Production Hrs. Annual 8,736
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $141,343 3,038,760 kWh $0.05
Electricity Demand $80,699 6,678 kW-months/year $12.08
Natural Gas $129,121 12,920 MMBtu $9.99
TOTAL ENERGY COSTS $351,163
RECOMMENDED SAVINGS* $51,548 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,880
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$14,346
Cost:
$12,800
- - - - $14,346 1,436 -
-
kWh
-
-
kW-months/year
$14,346
1,436
MMBtu
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$13,487
Cost:
$13,000
- - - - $13,487 1,350 -
-
kWh
-
-
kW-months/year
$13,487
1,350
MMBtu
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,300
Cost:
$1,500
- - - - $7,300 730 -
-
kWh
-
-
kW-months/year
$7,300
730
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,744
Cost:
$30,000
$2,757 59,274 $987 81 - - $2,757
59,274
kWh
$987
81
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,990
Cost:
$100
$2,200 46,550 $790 65 - - $2,200
46,550
kWh
$790
65
kW-months/year
-
-
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$8,186
Cost:
$10,960
- - - - $8,186 819 -
-
kWh
-
-
kW-months/year
$8,186
819
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$846
Cost:
$474
- - - - $846 85 -
-
kWh
-
-
kW-months/year
$846
85
MMBtu
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$649
Cost:
$1,200
- - - - $649 65 -
-
kWh
-
-
kW-months/year
$649
65
MMBtu
TOTAL RECOMMENDED Savings:
$51,548
Cost:
$70,034
$4,957 105,824 $1,777 146 $44,814 4,485 $4,957
105,824
kWh
$1,777
146
kW-months/year
$44,814
4,485
MMBtu
TOTAL IMPLEMENTED Savings:
$17,880
Cost:
$44,200
$2,757 59,274 $987 81 $14,136 1,415 $2,757
59,274
kWh
$987
81
kW-months/year
$14,136
1,415
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas