Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2009
Principal Product Capital Equipment for Heat Exchanger Industry
NAICS 333517 - Machine Tool Manufacturing
SIC 3542 - Machine Tools, Metal Forming Types
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 250,000
Annual Production 300 Pieces
Production Hrs. Annual 5,928
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $482,996 10,568,335 kWh $0.05
Electricity Demand $318,408 25,720 kW-months/year $12.38
Natural Gas $51,281 5,447 MMBtu $9.41
TOTAL ENERGY COSTS $852,685
RECOMMENDED SAVINGS* $58,558 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $52,412
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$37,050
Cost:
-
$22,442 491,081 $14,608 1,180 - - $22,442
491,081
kWh
$14,608
1,180
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,706
Cost:
$19,921
$7,393 161,767 $6,313 510 - - $7,393
161,767
kWh
$6,313
510
kW-months/year
-
-
MMBtu
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,516
Cost:
$100
$1,347 29,465 $1,169 94 - - $1,347
29,465
kWh
$1,169
94
kW-months/year
-
-
MMBtu
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,124
Cost:
$2,800
- - - - $2,124 233 -
-
kWh
-
-
kW-months/year
$2,124
233
MMBtu
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,656
Cost:
$500
- - - - $1,656 176 -
-
kWh
-
-
kW-months/year
$1,656
176
MMBtu
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,506
Cost:
$1,660
- - - - $1,506 160 -
-
kWh
-
-
kW-months/year
$1,506
160
MMBtu
TOTAL RECOMMENDED Savings:
$58,558
Cost:
$24,981
$31,182 682,313 $22,090 1,784 $5,286 569 $31,182
682,313
kWh
$22,090
1,784
kW-months/year
$5,286
569
MMBtu
TOTAL IMPLEMENTED Savings:
$52,412
Cost:
$20,421
$29,835 652,848 $20,921 1,690 $1,656 176 $29,835
652,848
kWh
$20,921
1,690
kW-months/year
$1,656
176
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas