Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2009 |
Principal Product | Capital Equipment for Heat Exchanger Industry |
NAICS | 333517 - Machine Tool Manufacturing |
SIC | 3542 - Machine Tools, Metal Forming Types |
Sales | $50,000,000-$100,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 300 Pieces |
Production Hrs. Annual | 5,928 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $482,996 | 10,568,335 | kWh | $0.05 |
Electricity Demand | $318,408 | 25,720 | kW-months/year | $12.38 |
Natural Gas | $51,281 | 5,447 | MMBtu | $9.41 |
TOTAL ENERGY COSTS | $852,685 | |||
RECOMMENDED SAVINGS* | $58,558 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $52,412 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $37,050 Cost: - |
$22,442 | 491,081 | $14,608 | 1,180 | - | - |
$22,442 491,081 kWh |
$14,608 1,180 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $13,706 Cost: $19,921 |
$7,393 | 161,767 | $6,313 | 510 | - | - |
$7,393 161,767 kWh |
$6,313 510 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,516 Cost: $100 |
$1,347 | 29,465 | $1,169 | 94 | - | - |
$1,347 29,465 kWh |
$1,169 94 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $2,124 Cost: $2,800 |
- | - | - | - | $2,124 | 233 |
- - kWh |
- - kW-months/year |
$2,124 233 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $1,656 Cost: $500 |
- | - | - | - | $1,656 | 176 |
- - kWh |
- - kW-months/year |
$1,656 176 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,506 Cost: $1,660 |
- | - | - | - | $1,506 | 160 |
- - kWh |
- - kW-months/year |
$1,506 160 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $58,558 Cost: $24,981 |
$31,182 | 682,313 | $22,090 | 1,784 | $5,286 | 569 | $31,182 682,313 kWh |
$22,090 1,784 kW-months/year |
$5,286 569 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $52,412 Cost: $20,421 |
$29,835 | 652,848 | $20,921 | 1,690 | $1,656 | 176 | $29,835 652,848 kWh |
$20,921 1,690 kW-months/year |
$1,656 176 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |