IAC Assessment: UM0359
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0359
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2009
Principal Product release agents and specialty lubricants
NAICS 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing
SIC 2899 - Chemical Preparations, Nec
Sales $50,000,000-$100,000,000
# of Employees 160
Plant Area (Sq.Ft.) 150,000
Annual Production 9,000 Thousand Gallons
Production Hrs. Annual 2,210
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $193,394 2,908,235 kWh $0.07
Electricity Demand $69,092 4,846 kW-months/year $14.26
Natural Gas $326,343 36,051 MMBtu $9.05
TOTAL ENERGY COSTS $588,829
RECOMMENDED SAVINGS* $78,020 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $60,686
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7314 REDUCE VENTILATION AIR Savings:
$20,146
Cost:
$500
- - - - $20,146 2,226 -
-
kWh
-
-
kW-months/year
$20,146
2,226
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,026
Cost:
$50,000
$7,614 114,427 $9,412 660 - - $7,614
114,427
kWh
$9,412
660
kW-months/year
-
-
MMBtu
03: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION Savings:
$13,963
Cost:
$400
$11,831 27,538 $2,132 149 - - $11,831
27,538
kWh
$2,132
149
kW-months/year
-
-
MMBtu
04: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$11,980
Cost:
$9,000
- - - - $11,980 1,324 -
-
kWh
-
-
kW-months/year
$11,980
1,324
MMBtu
05: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$6,298
Cost:
$24,510
- - - - $6,298 696 -
-
kWh
-
-
kW-months/year
$6,298
696
MMBtu
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT Savings:
$2,724
Cost:
$7,574
- - - - $2,724 301 -
-
kWh
-
-
kW-months/year
$2,724
301
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,630
Cost:
$5,000
$790 11,884 $1,840 129 - - $790
11,884
kWh
$1,840
129
kW-months/year
-
-
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,620
Cost:
$10,000
- - - - $1,620 179 -
-
kWh
-
-
kW-months/year
$1,620
179
MMBtu
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,161
Cost:
$30,000
$1,161 17,464 - - - - $1,161
17,464
kWh
-
-
kW-months/year
-
-
MMBtu
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$472
Cost:
$10,000
- - - - $472 60 -
-
kWh
-
-
kW-months/year
$472
60
MMBtu
TOTAL RECOMMENDED Savings:
$78,020
Cost:
$146,984
$21,396 171,313 $13,384 938 $43,240 4,786 $21,396
171,313
kWh
$13,384
938
kW-months/year
$43,240
4,786
MMBtu
TOTAL IMPLEMENTED Savings:
$60,686
Cost:
$125,410
$20,606 159,429 $11,544 809 $28,536 3,161 $20,606
159,429
kWh
$11,544
809
kW-months/year
$28,536
3,161
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas