Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2009 |
Principal Product | release agents and specialty lubricants |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 160 |
Plant Area (Sq.Ft.) | 150,000 |
Annual Production | 9,000 Thousand Gallons |
Production Hrs. Annual | 2,210 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $193,394 | 2,908,235 | kWh | $0.07 |
Electricity Demand | $69,092 | 4,846 | kW-months/year | $14.26 |
Natural Gas | $326,343 | 36,051 | MMBtu | $9.05 |
TOTAL ENERGY COSTS | $588,829 | |||
RECOMMENDED SAVINGS* | $78,020 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $60,686 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7314 REDUCE VENTILATION AIR |
Savings: $20,146 Cost: $500 |
- | - | - | - | $20,146 | 2,226 |
- - kWh |
- - kW-months/year |
$20,146 2,226 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $17,026 Cost: $50,000 |
$7,614 | 114,427 | $9,412 | 660 | - | - |
$7,614 114,427 kWh |
$9,412 660 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION |
Savings: $13,963 Cost: $400 |
$11,831 | 27,538 | $2,132 | 149 | - | - |
$11,831 27,538 kWh |
$2,132 149 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER |
Savings: $11,980 Cost: $9,000 |
- | - | - | - | $11,980 | 1,324 |
- - kWh |
- - kW-months/year |
$11,980 1,324 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7494 INSTALL STORM WINDOWS AND DOORS |
Savings: $6,298 Cost: $24,510 |
- | - | - | - | $6,298 | 696 |
- - kWh |
- - kW-months/year |
$6,298 696 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7241 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT |
Savings: $2,724 Cost: $7,574 |
- | - | - | - | $2,724 | 301 |
- - kWh |
- - kW-months/year |
$2,724 301 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $2,630 Cost: $5,000 |
$790 | 11,884 | $1,840 | 129 | - | - |
$790 11,884 kWh |
$1,840 129 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,620 Cost: $10,000 |
- | - | - | - | $1,620 | 179 |
- - kWh |
- - kW-months/year |
$1,620 179 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,161 Cost: $30,000 |
$1,161 | 17,464 | - | - | - | - |
$1,161 17,464 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES |
Savings: $472 Cost: $10,000 |
- | - | - | - | $472 | 60 |
- - kWh |
- - kW-months/year |
$472 60 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $78,020 Cost: $146,984 |
$21,396 | 171,313 | $13,384 | 938 | $43,240 | 4,786 | $21,396 171,313 kWh |
$13,384 938 kW-months/year |
$43,240 4,786 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $60,686 Cost: $125,410 |
$20,606 | 159,429 | $11,544 | 809 | $28,536 | 3,161 | $20,606 159,429 kWh |
$11,544 809 kW-months/year |
$28,536 3,161 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |