Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2010 |
Principal Product | Paper plates, Paper Cups, Napkins |
NAICS | 322299 - All Other Converted Paper Product Manufacturing |
SIC | 2679 - Converted Paper Products, Nec |
Sales | $100,000,000-$500,000,000 |
# of Employees | 232 |
Plant Area (Sq.Ft.) | 588,000 |
Annual Production | 201,332,862 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $550,751 | 6,973,478 | kWh | $0.08 |
Electricity Demand | $195,692 | 15,351 | kW-months/year | $12.75 |
Natural Gas | $202,159 | 21,349 | MMBtu | $9.47 |
TOTAL ENERGY COSTS | $948,602 | |||
RECOMMENDED SAVINGS* | $179,877 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $8,778 Cost: $1,000 |
- | - | - | - | $8,778 | 1,009 |
- - kWh |
- - kW-months/year |
$8,778 1,009 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $65,841 Cost: $24,120 |
$37,774 | 763,119 | $28,067 | 183 | - | - |
$37,774 763,119 kWh |
$28,067 183 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $24,348 Cost: $8,750 |
- | - | - | - | $24,348 | 2,881 |
- - kWh |
- - kW-months/year |
$24,348 2,881 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $14,135 Cost: $31,924 |
$14,135 | 178,923 | - | - | - | - |
$14,135 178,923 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $6,734 Cost: $14,340 |
$6,734 | - | - | - | - | - |
$6,734 - kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,240 Cost: $200 |
$2,327 | 47,008 | $1,913 | 150 | - | - |
$2,327 47,008 kWh |
$1,913 150 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING |
Savings: $45,305 Cost: $14,000 |
- | - | - | - | $45,305 | 4,784 |
- - kWh |
- - kW-months/year |
$45,305 4,784 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $3,583 Cost: $2,000 |
$1,352 | 27,306 | $2,231 | 175 | - | - |
$1,352 27,306 kWh |
$2,231 175 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION |
Savings: $6,913 Cost: $2,000 |
$6,913 | 139,651 | - | - | - | - |
$6,913 139,651 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $179,877 Cost: $98,334 |
$69,235 | 1,156,007 | $32,211 | 508 | $78,431 | 8,674 | $69,235 1,156,007 kWh |
$32,211 508 kW-months/year |
$78,431 8,674 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |