IAC logo
IAC Assessment: UM0360
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0360
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2010
Principal Product Paper plates, Paper Cups, Napkins
NAICS 322299 - All Other Converted Paper Product Manufacturing
SIC 2679 - Converted Paper Products, Nec
Sales $100,000,000-$500,000,000
# of Employees 232
Plant Area (Sq.Ft.) 588,000
Annual Production 201,332,862 Pieces
Production Hrs. Annual 4,160
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $550,751 6,973,478 kWh $0.08
Electricity Demand $195,692 15,351 kW-months/year $12.75
Natural Gas $202,159 21,349 MMBtu $9.47
TOTAL ENERGY COSTS $948,602
RECOMMENDED SAVINGS* $179,877 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$8,778
Cost:
$1,000
- - - - $8,778 1,009 -
-
kWh
-
-
kW-months/year
$8,778
1,009
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$65,841
Cost:
$24,120
$37,774 763,119 $28,067 183 - - $37,774
763,119
kWh
$28,067
183
kW-months/year
-
-
MMBtu
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$24,348
Cost:
$8,750
- - - - $24,348 2,881 -
-
kWh
-
-
kW-months/year
$24,348
2,881
MMBtu
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$14,135
Cost:
$31,924
$14,135 178,923 - - - - $14,135
178,923
kWh
-
-
kW-months/year
-
-
MMBtu
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,734
Cost:
$14,340
$6,734 - - - - - $6,734
-
kWh
-
-
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$4,240
Cost:
$200
$2,327 47,008 $1,913 150 - - $2,327
47,008
kWh
$1,913
150
kW-months/year
-
-
MMBtu
07: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$45,305
Cost:
$14,000
- - - - $45,305 4,784 -
-
kWh
-
-
kW-months/year
$45,305
4,784
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,583
Cost:
$2,000
$1,352 27,306 $2,231 175 - - $1,352
27,306
kWh
$2,231
175
kW-months/year
-
-
MMBtu
09: 2.7263 LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION Savings:
$6,913
Cost:
$2,000
$6,913 139,651 - - - - $6,913
139,651
kWh
-
-
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$179,877
Cost:
$98,334
$69,235 1,156,007 $32,211 508 $78,431 8,674 $69,235
1,156,007
kWh
$32,211
508
kW-months/year
$78,431
8,674
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas