IAC logo
IAC Assessment: UM0364
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0364
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2010
Principal Product Die Cast Dies and Injection Molds
NAICS 333514 - Special Die and Tool, Die Set, Jig, and Fixture Manufacturing
SIC 3544 - Special Dies, Tools, Jigs & Fixtures
Sales $5,000,000-$10,000,000
# of Employees 50
Plant Area (Sq.Ft.) 125,304
Annual Production 50 Units
Production Hrs. Annual 3,055
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $82,334 1,584,375 kWh $0.05
Electricity Demand $60,984 4,321 kW-months/year $14.11
Natural Gas $17,625 1,757 MMBtu $10.03
TOTAL ENERGY COSTS $160,943
RECOMMENDED SAVINGS* $12,909 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,151
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$5,260
Cost:
$8,716
$5,260 101,221 - - - - $5,260
101,221
kWh
-
-
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,618
Cost:
$7,917
$838 16,122 $780 55 - - $838
16,122
kWh
$780
55
kW-months/year
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,498
Cost:
$1,464
$1,498 28,829 - - - - $1,498
28,829
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$913
Cost:
$2,000
$583 11,217 $330 23 - - $583
11,217
kWh
$330
23
kW-months/year
-
-
MMBtu
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,885
Cost:
$5,500
- - - - $1,885 188 -
-
kWh
-
-
kW-months/year
$1,885
188
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,735
Cost:
$500
- - - - $1,735 173 -
-
kWh
-
-
kW-months/year
$1,735
173
MMBtu
TOTAL RECOMMENDED Savings:
$12,909
Cost:
$26,097
$8,179 157,389 $1,110 78 $3,620 361 $8,179
157,389
kWh
$1,110
78
kW-months/year
$3,620
361
MMBtu
TOTAL IMPLEMENTED Savings:
$6,151
Cost:
$15,917
$1,421 27,339 $1,110 78 $3,620 361 $1,421
27,339
kWh
$1,110
78
kW-months/year
$3,620
361
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas