IAC logo
IAC Assessment: UM0368
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0368
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2010
Principal Product Truck bodies
NAICS 336211 - Motor Vehicle Body Manufacturing
SIC 3713 - Truck And Bus Bodies
Sales $100,000,000-$500,000,000
# of Employees 318
Plant Area (Sq.Ft.) 384,210
Annual Production 5,500 Pieces
Production Hrs. Annual 2,083
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $297,260 6,556,364 kWh $0.05
Electricity Demand $197,967 15,991 kW-months/year $12.38
Natural Gas $410,706 45,515 MMBtu $9.02
TOTAL ENERGY COSTS $905,933
RECOMMENDED SAVINGS* $89,436 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$44,687
Cost:
$124,913
$22,824 503,402 $21,863 1,766 - - - - $22,824
503,402
kWh
$21,863
1,766
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$3,110
Cost:
$6,000
$1,588 34,355 $1,522 123 - - - - $1,588
34,355
kWh
$1,522
123
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,430
Cost:
$2,852
$2,430 53,592 - - - - - - $2,430
53,592
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
04: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS Savings:
$34,139
Cost:
$333,550
- - - - - - $34,139 3,785 -
-
kWh
-
-
kW-months/year
-
-
$
$34,139
3,785
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,327
Cost:
$574
- - - - $2,327 - - - -
-
kWh
-
-
kW-months/year
$2,327
-
$
-
-
MMBtu
06: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$1,579
Cost:
$8,070
- - - - - - $1,579 175 -
-
kWh
-
-
kW-months/year
-
-
$
$1,579
175
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,164
Cost:
$1,000
- - - - - - $1,164 129 -
-
kWh
-
-
kW-months/year
-
-
$
$1,164
129
MMBtu
TOTAL RECOMMENDED Savings:
$89,436
Cost:
$476,959
$26,842 591,349 $23,385 1,889 $2,327 - $36,882 4,089 $26,842
591,349
kWh
$23,385
1,889
kW-months/year
$2,327
-
$
$36,882
4,089
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas