Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2010 |
Principal Product | Processed steel coils |
NAICS | 336370 - Motor Vehicle Metal Stamping |
SIC | 3465 - Automotive Stampings |
Sales | $50,000,000-$100,000,000 |
# of Employees | 90 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 500,000 Tons |
Production Hrs. Annual | 7,488 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $200,631 | 4,435,480 | kWh | $0.05 |
Electricity Demand | $173,515 | 10,832 | kW-months/year | $16.02 |
Natural Gas | $118,639 | 19,434 | MMBtu | $6.10 |
TOTAL ENERGY COSTS | $492,785 | |||
RECOMMENDED SAVINGS* | $42,479 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $35,278 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $8,910 Cost: $1,680 |
$8,910 | 197,000 | - | - | - | - |
$8,910 197,000 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES |
Savings: $4,068 Cost: $10 |
$896 | 19,800 | $3,172 | 198 | - | - |
$896 19,800 kWh |
$3,172 198 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $695 Cost: $2,500 |
$695 | 9,834 | - | - | - | - |
$695 9,834 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $443 Cost: $2,210 |
$283 | 6,256 | $160 | 10 | - | - |
$283 6,256 kWh |
$160 10 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $12,318 Cost: $21,700 |
- | - | - | - | $12,318 | 2,349 |
- - kWh |
- - kW-months/year |
$12,318 2,349 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7442 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE |
Savings: $11,181 Cost: $2,254 |
- | - | - | - | $11,181 | 1,833 |
- - kWh |
- - kW-months/year |
$11,181 1,833 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,409 Cost: $1,874 |
- | - | - | - | $1,409 | 231 |
- - kWh |
- - kW-months/year |
$1,409 231 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2123 INSULATE FEEDWATER TANK |
Savings: $1,281 Cost: $1,449 |
- | - | - | - | $1,281 | 210 |
- - kWh |
- - kW-months/year |
$1,281 210 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $1,164 Cost: $1,000 |
- | - | - | - | $1,164 | 191 |
- - kWh |
- - kW-months/year |
$1,164 191 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,010 Cost: $1,300 |
- | - | - | - | $1,010 | 165 |
- - kWh |
- - kW-months/year |
$1,010 165 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $42,479 Cost: $35,977 |
$10,784 | 232,890 | $3,332 | 208 | $28,363 | 4,979 | $10,784 232,890 kWh |
$3,332 208 kW-months/year |
$28,363 4,979 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $35,278 Cost: $30,434 |
$9,605 | 206,834 | - | - | $25,673 | 4,538 | $9,605 206,834 kWh |
- - kW-months/year |
$25,673 4,538 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |