IAC logo
IAC Assessment: UM0370
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0370
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2010
Principal Product Soft Drinks
NAICS 312111 - Soft Drink Manufacturing
SIC 2086 - Bottled And Canned Soft Drinks
Sales $100,000,000-$500,000,000
# of Employees 300
Plant Area (Sq.Ft.) 200,000
Annual Production 15,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $373,353 7,772,222 kWh $0.05
Electricity Demand $265,962 17,938 kW-months/year $14.83
Natural Gas $561,274 61,645 MMBtu $9.10
TOTAL ENERGY COSTS $1,200,589
RECOMMENDED SAVINGS* $200,760 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $128,394
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$76,860
Cost:
$90,000
$48,208 1,003,492 $28,652 1,930 - - $48,208
1,003,492
kWh
$28,652
1,930
kW-months/year
-
-
MMBtu
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$17,172
Cost:
$8,188
$17,172 357,448 - - - - $17,172
357,448
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$11,691
Cost:
$7,980
$11,691 243,360 - - - - $11,691
243,360
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,537
Cost:
$200
$4,102 85,387 $2,435 164 - - $4,102
85,387
kWh
$2,435
164
kW-months/year
-
-
MMBtu
05: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$2,121
Cost:
$10
$519 10,800 $1,602 108 - - $519
10,800
kWh
$1,602
108
kW-months/year
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,990
Cost:
$1,000
$1,248 25,985 $742 50 - - $1,248
25,985
kWh
$742
50
kW-months/year
-
-
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$33,206
Cost:
$1,000
$11,500 239,381 $6,837 461 $14,869 1,634 $11,500
239,381
kWh
$6,837
461
kW-months/year
$14,869
1,634
MMBtu
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$30,358
Cost:
$27,940
- - - - $30,358 3,336 -
-
kWh
-
-
kW-months/year
$30,358
3,336
MMBtu
09: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$19,669
Cost:
$15,750
- - - - $19,669 2,421 -
-
kWh
-
-
kW-months/year
$19,669
2,421
MMBtu
10: 2.7494 INSTALL STORM WINDOWS AND DOORS Savings:
$1,156
Cost:
$9,300
- - - - $1,156 127 -
-
kWh
-
-
kW-months/year
$1,156
127
MMBtu
TOTAL RECOMMENDED Savings:
$200,760
Cost:
$161,368
$94,440 1,965,853 $40,268 2,713 $66,052 7,518 $94,440
1,965,853
kWh
$40,268
2,713
kW-months/year
$66,052
7,518
MMBtu
TOTAL IMPLEMENTED Savings:
$128,394
Cost:
$108,488
$76,880 1,600,321 $35,489 2,391 $16,025 1,761 $76,880
1,600,321
kWh
$35,489
2,391
kW-months/year
$16,025
1,761
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas