IAC Assessment: UM0384
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0384
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2011
Principal Product Injection Molded Parts
NAICS 326199 - All Other Plastics Product Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 55,000
Annual Production 40,000,000 Pieces
Production Hrs. Annual 6,600
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $322,057 6,076,691 kWh $0.05
Electricity Demand $195,148 10,559 kW-months/year $18.48
Natural Gas $22,675 2,320 MMBtu $9.77
TOTAL ENERGY COSTS $539,880
RECOMMENDED SAVINGS* $50,297 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,081
Cost:
$38,947
$14,544 274,417 $9,537 516 - - - - $14,544
274,417
kWh
$9,537
516
kW-months/year
-
-
$
-
-
MMBtu
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$6,227
Cost:
$12,120
$6,227 117,480 - - - - - - $6,227
117,480
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,589
Cost:
$3,850
- - - - $4,589 - - - -
-
kWh
-
-
kW-months/year
$4,589
-
$
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,147
Cost:
$200
$2,147 40,517 - - - - - - $2,147
40,517
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,971
Cost:
$2,584
$1,971 37,197 - - - - - - $1,971
37,197
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,811
Cost:
$5,000
$1,811 34,172 - - - - - - $1,811
34,172
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,389
Cost:
$1,350
$1,389 26,220 - - - - - - $1,389
26,220
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
08: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$180
Cost:
$10
$180 3,400 - - - - - - $180
3,400
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,902
Cost:
$10,000
- - - - - - $7,902 808 -
-
kWh
-
-
kW-months/year
-
-
$
$7,902
808
MMBtu
TOTAL RECOMMENDED Savings:
$50,297
Cost:
$74,061
$28,269 533,403 $9,537 516 $4,589 - $7,902 808 $28,269
533,403
kWh
$9,537
516
kW-months/year
$4,589
-
$
$7,902
808
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas