Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2012
Principal Product Blow Molding Equipment
NAICS 332999 - All Other Miscellaneous Fabricated Metal Product Manufacturing
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 100,000
Annual Production 10,000 Pieces
Production Hrs. Annual 2,600
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $285,862 2,509,604 kWh $0.11
Natural Gas $97,569 11,878 MMBtu $8.21
TOTAL ENERGY COSTS $389,817
RECOMMENDED SAVINGS* $19,301 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $12,105
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$874
Cost:
$1,000
$874 7,670 - - $874
7,670
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,308
Cost:
$2,850
$6,308 55,340 - - $6,308
55,340
kWh
-
-
MMBtu
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$775
Cost:
$100
$775 6,800 - - $775
6,800
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,482
Cost:
$600
$1,482 13,000 - - $1,482
13,000
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,923
Cost:
$1,300
$4,923 43,192 - - $4,923
43,192
kWh
-
-
MMBtu
06: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,939
Cost:
$4,000
- - $4,939 601 -
-
kWh
$4,939
601
MMBtu
TOTAL RECOMMENDED Savings:
$19,301
Cost:
$9,850
$14,362 126,002 $4,939 601 $14,362
126,002
kWh
$4,939
601
MMBtu
TOTAL IMPLEMENTED Savings:
$12,105
Cost:
$5,150
$12,105 106,202 - - $12,105
106,202
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas