IAC logo
IAC Assessment: UM0415
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0415
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2012
Principal Product sheet metal,parts,tooling, tamping
NAICS 332439 - Other Metal Container Manufacturing
SIC 3469 - Metal Stampings, Nec
Sales $1,000,000-$5,000,000
# of Employees 146
Plant Area (Sq.Ft.) 100,000
Annual Production 100,000 Units
Production Hrs. Annual 5,600
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $448,106 4,976,230 kWh $0.09
Electricity Demand $106,210 42,484 kW-months/year $2.50
Natural Gas $167,204 22,865 MMBtu $7.31
TOTAL ENERGY COSTS $721,520
RECOMMENDED SAVINGS* $48,104 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,422
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$8,072
Cost:
$4,000
$8,072 89,690 - - - - - - $8,072
89,690
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$822
Cost:
$875
$822 9,128 - - - - - - $822
9,128
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,081
Cost:
$20,000
$8,135 90,394 $430 172 - - $3,516 - $8,135
90,394
kWh
$430
172
kW-months/year
-
-
MMBtu
$3,516
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,832
Cost:
$10,965
$1,832 20,341 - - - - - - $1,832
20,341
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$23,600
Cost:
$1,000
- - - - $23,600 3,227 - - -
-
kWh
-
-
kW-months/year
$23,600
3,227
MMBtu
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,697
Cost:
$1,500
- - - - $1,697 232 - - -
-
kWh
-
-
kW-months/year
$1,697
232
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$48,104
Cost:
$38,340
$18,861 209,553 $430 172 $25,297 3,459 $3,516 - $18,861
209,553
kWh
$430
172
kW-months/year
$25,297
3,459
MMBtu
$3,516
-
$
TOTAL IMPLEMENTED Savings:
$24,422
Cost:
$1,875
$822 9,128 - - $23,600 3,227 - - $822
9,128
kWh
-
-
kW-months/year
$23,600
3,227
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas One-time Revenue or Avoided Cost