IAC Assessment: UM0427
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0427
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2013
Principal Product Liquid, granular, and brown sucrose from cane sugar
NAICS 311314 - Cane Sugar Manufacturing
SIC 2062 - Cane Sugar Refining
Sales $50,000,000-$100,000,000
# of Employees 90
Plant Area (Sq.Ft.) 150,000
Annual Production 90,000 Tons
Production Hrs. Annual 7,920
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $561,491 4,468,320 kWh $0.13
Natural Gas $1,042,759 172,506 MMBtu $6.04
TOTAL ENERGY COSTS $1,604,250
RECOMMENDED SAVINGS* $290,129 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,586
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,442
Cost:
$10,650
$10,442 82,875 - - $10,442
82,875
kWh
-
-
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,680
Cost:
$9,000
- - $13,680 2,265 -
-
kWh
$13,680
2,265
MMBtu
03: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$21,140
Cost:
$5,000
- - $21,140 3,500 -
-
kWh
$21,140
3,500
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,906
Cost:
$6,500
$27,906 221,473 - - $27,906
221,473
kWh
-
-
MMBtu
05: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$196,098
Cost:
$500,000
$491,400 3,900,000 $(-295,302) (-48,891) $491,400
3,900,000
kWh
$(-295,302)
(-48,891)
MMBtu
06: 2.3312 INSTALL EFFICIENT RECTIFIERS Savings:
$20,863
Cost:
$12,000
$20,863 165,581 - - $20,863
165,581
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$290,129
Cost:
$543,150
$550,611 4,369,929 $(-260,482) (-43,126) $550,611
4,369,929
kWh
$(-260,482)
(-43,126)
MMBtu
TOTAL IMPLEMENTED Savings:
$41,586
Cost:
$15,500
$27,906 221,473 $13,680 2,265 $27,906
221,473
kWh
$13,680
2,265
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas