Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2013 |
Principal Product | Mold Manufacturing |
NAICS | 333511 - Industrial Mold Manufacturing |
SIC | 3544 - Special Dies, Tools, Jigs & Fixtures |
Sales | $50,000,000-$100,000,000 |
# of Employees | 205 |
Plant Area (Sq.Ft.) | 300,000 |
Annual Production | 5,000 Units |
Production Hrs. Annual | 8,000 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $304,200 | 5,296,130 | kWh | $0.06 |
Electricity Demand | $204,800 | 12,248 | kW-months/year | $16.72 |
Natural Gas | $27,300 | 3,590 | MMBtu | $7.60 |
TOTAL ENERGY COSTS | $536,300 | |||
RECOMMENDED SAVINGS* | $56,157 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,480 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $11,350 Cost: $4,000 |
$6,760 | 117,680 | $4,590 | 275 | - | - |
$6,760 117,680 kWh |
$4,590 275 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $10,400 Cost: $200 |
$10,400 | 181,427 | - | - | - | - |
$10,400 181,427 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $6,400 Cost: $10,000 |
$6,400 | 111,403 | - | - | - | - |
$6,400 111,403 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM |
Savings: $11,900 Cost: $5,000 |
$8,300 | 144,552 | $3,600 | 217 | - | - |
$8,300 144,552 kWh |
$3,600 217 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $1,000 Cost: $2,500 |
$1,000 | 17,350 | - | - | - | - |
$1,000 17,350 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $6,700 Cost: $5,700 |
$6,700 | 56,000 | - | - | - | - |
$6,700 56,000 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,430 Cost: $510 |
$520 | 9,118 | $910 | 55 | - | - |
$520 9,118 kWh |
$910 55 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7491 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS |
Savings: $2,177 Cost: $4,660 |
$800 | 14,150 | $400 | 24 | $977 | 135 |
$800 14,150 kWh |
$400 24 kW-months/year |
$977 135 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $4,800 Cost: $1,500 |
- | - | - | - | $4,800 | 622 |
- - kWh |
- - kW-months/year |
$4,800 622 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $56,157 Cost: $34,070 |
$40,880 | 651,680 | $9,500 | 571 | $5,777 | 757 | $40,880 651,680 kWh |
$9,500 571 kW-months/year |
$5,777 757 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,480 Cost: $10,210 |
$13,980 | 182,798 | $5,500 | 330 | - | - | $13,980 182,798 kWh |
$5,500 330 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |