IAC Assessment: UM0459
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0459
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2015
Principal Product glass fibre
NAICS 327993 - Mineral Wool Manufacturing
SIC 3296 - Mineral Wool
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 63,000
Annual Production 59,463 Tons
Production Hrs. Annual 7,020
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $732,620 18,024,194 kWh $0.04
Electricity Demand $800,797 34,532 kW-months/year $23.19
Natural Gas $814,523 160,507 MMBtu $5.07
Other Energy $4,543,479 243,696 MMBtu $18.64
TOTAL ENERGY COSTS $6,988,938
RECOMMENDED SAVINGS* $415,848 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $299,710
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Energy Electricity Usage Electricity Demand Natural Gas Other Energy
$ kWh $ kW-months/year $ MMBtu $ MMBtu
01: 2.2421 INSTALL WASTE HEAT BOILER TO PROVIDE DIRECT POWER Savings:
$115,156
Cost:
$525,000
$66,591 1,705,000 $68,134 2,928 $(-19,569) (-3,858) - - $66,591
1,705,000
kWh
$68,134
2,928
kW-months/year
$(-19,569)
(-3,858)
MMBtu
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$982
Cost:
$800
$509 12,730 $473 20 - - - - $509
12,730
kWh
$473
20
kW-months/year
-
-
MMBtu
-
-
MMBtu
03: 2.1133 ADJUST BURNERS FOR EFFICIENT OPERATION Savings:
$299,710
Cost:
$30,000
- - - - - - $299,710 16,347 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$299,710
16,347
MMBtu
TOTAL RECOMMENDED Savings:
$415,848
Cost:
$555,800
$67,100 1,717,730 $68,607 2,948 $(-19,569) (-3,858) $299,710 16,347 $67,100
1,717,730
kWh
$68,607
2,948
kW-months/year
$(-19,569)
(-3,858)
MMBtu
$299,710
16,347
MMBtu
TOTAL IMPLEMENTED Savings:
$299,710
Cost:
$30,000
- - - - - - $299,710 16,347 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$299,710
16,347
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu
Electricity Usage Electricity Demand Natural Gas Other Energy Electricity Usage Electricity Demand Natural Gas Other Energy