IAC logo
IAC Assessment: UM0463
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0463
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2015
Principal Product cast ductile iron
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 350
Plant Area (Sq.Ft.) 150,000
Annual Production 78,109 Tons
Production Hrs. Annual 4,920
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,857,380 45,320,018 kWh $0.09
Natural Gas $794,216 183,476 MMBtu $4.33
Other Gas $3,630,266 500,000 MMBtu $7.26
TOTAL ENERGY COSTS $8,281,862
RECOMMENDED SAVINGS* $4,268,828 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $150,724
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Gas Personnel Changes Electricity Usage Natural Gas Other Gas Personnel Changes
$ kWh $ MMBtu $ MMBtu $ $
01: 2.3412 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR Savings:
$1,052,850
Cost:
$1,822,453
$879,675 10,228,778 $173,175 39,994 - - - - $879,675
10,228,778
kWh
$173,175
39,994
MMBtu
-
-
MMBtu
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$150,724
Cost:
$565,274
$32,722 380,493 - - - - $118,002 - $32,722
380,493
kWh
-
-
MMBtu
-
-
MMBtu
$118,002
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$12,674
Cost:
$4,000
- - $12,674 2,932 - - - - -
-
kWh
$12,674
2,932
MMBtu
-
-
MMBtu
-
-
$
04: 2.1125 CONVERT TO OXYFUEL BURNERS Savings:
$3,052,580
Cost:
$1,000,000
$(-95,202) (-1,107,000) - - $3,197,782 440,405 $(-50,000) - $(-95,202)
(-1,107,000)
kWh
-
-
MMBtu
$3,197,782
440,405
MMBtu
$(-50,000)
-
$
TOTAL RECOMMENDED Savings:
$4,268,828
Cost:
$3,391,727
$817,195 9,502,271 $185,849 42,926 $3,197,782 440,405 $68,002 - $817,195
9,502,271
kWh
$185,849
42,926
MMBtu
$3,197,782
440,405
MMBtu
$68,002
-
$
TOTAL IMPLEMENTED Savings:
$150,724
Cost:
$565,274
$32,722 380,493 - - - - $118,002 - $32,722
380,493
kWh
-
-
MMBtu
-
-
MMBtu
$118,002
-
$