Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Michigan |
---|---|
Assessment Year | 2016 |
Principal Product | Die cast machines |
NAICS | 333517 - Machine Tool Manufacturing |
SIC | 3542 - Machine Tools, Metal Forming Types |
Sales | $50,000,000-$100,000,000 |
# of Employees | 121 |
Plant Area (Sq.Ft.) | 70,000 |
Annual Production | 40 Pieces |
Production Hrs. Annual | 3,120 |
Location (State) | MI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $123,581 | 2,095,200 | kWh | $0.06 |
Electricity Demand | $46,395 | 5,580 | kW-months/year | $8.31 |
Natural Gas | $58,337 | 8,284 | MMBtu | $7.04 |
TOTAL ENERGY COSTS | $228,313 | |||
RECOMMENDED SAVINGS* | $15,217 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $3,158 Cost: $5,250 |
$2,650 | 44,928 | $508 | 61 | - | - | - | - |
$2,650 44,928 kWh |
$508 61 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,640 Cost: $2,000 |
$1,064 | 18,049 | $576 | 69 | - | - | - | - |
$1,064 18,049 kWh |
$576 69 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $485 Cost: $1,029 |
$296 | 5,012 | $448 | 54 | $(-259) | (-37) | - | - |
$296 5,012 kWh |
$448 54 kW-months/year |
$(-259) (-37) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $8,573 Cost: - |
- | - | $9,573 | 1,152 | - | - | $(-1,000) | - |
- - kWh |
$9,573 1,152 kW-months/year |
- - MMBtu |
$(-1,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,361 Cost: $150 |
- | - | - | - | $1,361 | 193 | - | - |
- - kWh |
- - kW-months/year |
$1,361 193 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $15,217 Cost: $8,429 |
$4,010 | 67,989 | $11,105 | 1,337 | $1,102 | 157 | $(-1,000) | - | $4,010 67,989 kWh |
$11,105 1,337 kW-months/year |
$1,102 157 MMBtu |
$(-1,000) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |