IAC Assessment: UM0465
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0465
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2016
Principal Product Die cast machines
NAICS 333517 - Machine Tool Manufacturing
SIC 3542 - Machine Tools, Metal Forming Types
Sales $50,000,000-$100,000,000
# of Employees 121
Plant Area (Sq.Ft.) 70,000
Annual Production 40 Pieces
Production Hrs. Annual 3,120
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $123,581 2,095,200 kWh $0.06
Electricity Demand $46,395 5,580 kW-months/year $8.31
Natural Gas $58,337 8,284 MMBtu $7.04
TOTAL ENERGY COSTS $228,313
RECOMMENDED SAVINGS* $15,217 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,158
Cost:
$5,250
$2,650 44,928 $508 61 - - - - $2,650
44,928
kWh
$508
61
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,640
Cost:
$2,000
$1,064 18,049 $576 69 - - - - $1,064
18,049
kWh
$576
69
kW-months/year
-
-
MMBtu
-
-
$
03: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$485
Cost:
$1,029
$296 5,012 $448 54 $(-259) (-37) - - $296
5,012
kWh
$448
54
kW-months/year
$(-259)
(-37)
MMBtu
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$8,573
Cost:
-
- - $9,573 1,152 - - $(-1,000) - -
-
kWh
$9,573
1,152
kW-months/year
-
-
MMBtu
$(-1,000)
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,361
Cost:
$150
- - - - $1,361 193 - - -
-
kWh
-
-
kW-months/year
$1,361
193
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$15,217
Cost:
$8,429
$4,010 67,989 $11,105 1,337 $1,102 157 $(-1,000) - $4,010
67,989
kWh
$11,105
1,337
kW-months/year
$1,102
157
MMBtu
$(-1,000)
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes