Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
IAC Assessment: UM0468
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: UM0468
IAC Center University of Michigan
Assessment Year 2016
Principal Product Anodize, Hardcoat, conversion coatings on aluminum
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $11,000,000
# of Employees 148
Plant Area (Sq.Ft.) 55,750
Annual Production 100,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) MI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $576,647 7,987,560 kWh $0.07
Natural Gas $32,206 31,475 MMBtu $1.02
TOTAL ENERGY COSTS $608,853
RECOMMENDED SAVINGS* $28,291 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,797
#|Description Savings
Cost
Status Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost
$ kWh $ MMBtu $ $
01: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$695
Cost:
$1,500
$695 9,651 - - - - $695
9,651
kWh
-
-
MMBtu
-
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,680
Cost:
$2,150
$4,680 64,995 - - - - $4,680
64,995
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$15,125
Cost:
$43,167
$13,209 183,456 - - $1,916 - $13,209
183,456
kWh
-
-
MMBtu
$1,916
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$3,084
Cost:
$2,000
$3,084 42,833 - - - - $3,084
42,833
kWh
-
-
MMBtu
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,588
Cost:
$1,500
$1,588 22,050 - - - - $1,588
22,050
kWh
-
-
MMBtu
-
-
$
06: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,119
Cost:
$10,000
- - $3,119 3,058 - - -
-
kWh
$3,119
3,058
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$28,291
Cost:
$60,317
$23,256 322,985 $3,119 3,058 $1,916 - $23,256
322,985
kWh
$3,119
3,058
MMBtu
$1,916
-
$
TOTAL IMPLEMENTED Savings:
$19,797
Cost:
$46,667
$17,881 248,339 - - $1,916 - $17,881
248,339
kWh
-
-
MMBtu
$1,916
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas One-time Revenue or Avoided Cost Electricity Usage Natural Gas One-time Revenue or Avoided Cost