IAC Assessment: UM0480
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UM0480
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Michigan
Assessment Year 2017
Principal Product Steering Assembly Components
NAICS 332111 - Iron and Steel Forging
SIC 3462 - Iron And Steel Forgings
Sales $10,000,000-$50,000,000
# of Employees 92
Plant Area (Sq.Ft.) 80,000
Annual Production 2,700,000 Units
Production Hrs. Annual 2,600
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $899,450 11,017,800 kWh $0.08
Electricity Demand $234,144 39,024 kW-months/year $6.00
Electricity Fees $7,387 - $ -
Natural Gas $24,998 7,462 MMBtu $3.35
TOTAL ENERGY COSTS $1,165,979
RECOMMENDED SAVINGS* $49,537 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$35,941
Cost:
$20,000
$22,677 276,547 $5,877 980 $7,387 - $22,677
276,547
kWh
$5,877
980
kW-months/year
$7,387
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,908
Cost:
$2,500
$1,908 23,266 - - - - $1,908
23,266
kWh
-
-
kW-months/year
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,601
Cost:
$28,500
$6,601 80,495 - - - - $6,601
80,495
kWh
-
-
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,087
Cost:
$6,000
$5,087 62,042 - - - - $5,087
62,042
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$49,537
Cost:
$57,000
$36,273 442,350 $5,877 980 $7,387 - $36,273
442,350
kWh
$5,877
980
kW-months/year
$7,387
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees