IAC Assessment: UU0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2002
Principal Product Treadmills
NAICS n/a
SIC 3949 - Sporting And Athletic Goods, Nec
Sales <$500,000
# of Employees 1,500
Plant Area (Sq.Ft.) 470,000
Annual Production 1,000,000 Pieces
Production Hrs. Annual 5,030
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $533,846 17,762,456 kWh $0.03
Electricity Demand $317,677 2,110 kW-months/year $150.56
Electricity Fees $51,091 - $ -
Natural Gas $255,285 109,555 MMBtu $2.33
TOTAL ENERGY COSTS $1,247,899
RECOMMENDED SAVINGS* $113,595 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $86,926
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,413
Cost:
$8,128
$2,500 78,585 $1,913 145 - - - - $2,500
78,585
kWh
$1,913
145
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,462
Cost:
$610
- - - - $3,462 1,172 - - -
-
kWh
-
-
kW-months/year
$3,462
1,172
MMBtu
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,467
Cost:
$460
$3,244 102,067 $3,223 244 - - - - $3,244
102,067
kWh
$3,223
244
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,706
Cost:
$18,000
- - $14,706 1,113 - - - - -
-
kWh
$14,706
1,113
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$22,256
Cost:
$31,800
$520 16,337 $410 31 $21,326 7,219 - - $520
16,337
kWh
$410
31
kW-months/year
$21,326
7,219
MMBtu
-
-
lb
06: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$62,291
Cost:
$17,100
- - - - - - $62,291 1,785,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$62,291
1,785,000
lb
TOTAL RECOMMENDED Savings:
$113,595
Cost:
$76,098
$6,264 196,989 $20,252 1,533 $24,788 8,391 $62,291 1,785,000 $6,264
196,989
kWh
$20,252
1,533
kW-months/year
$24,788
8,391
MMBtu
$62,291
1,785,000
lb
TOTAL IMPLEMENTED Savings:
$86,926
Cost:
$36,170
$3,244 102,067 $17,929 1,357 $3,462 1,172 $62,291 1,785,000 $3,244
102,067
kWh
$17,929
1,357
kW-months/year
$3,462
1,172
MMBtu
$62,291
1,785,000
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)