Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2002 |
Principal Product | Diamond Impregnated Drill Bits |
NAICS | n/a |
SIC | 3532 - Mining Machinery |
Sales | $50,000,000-$100,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 40,230 |
Annual Production | 750,000 Pieces |
Production Hrs. Annual | 4,262 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $36,534 | 1,383,040 | kWh | $0.03 |
Electricity Demand | $35,536 | 4,221 | kW-months/year | $8.42 |
Electricity Fees | $9,348 | - | $ | - |
Natural Gas | $29,464 | 4,724 | MMBtu | $6.24 |
TOTAL ENERGY COSTS | $110,882 | |||
RECOMMENDED SAVINGS* | $18,291 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $18,291 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,405 Cost: $13,567 |
$2,336 | 77,489 | $2,069 | 235 | - | - | - | - | - | - |
$2,336 77,489 kWh |
$2,069 235 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3212 OPTIMIZE PLANT POWER FACTOR |
Savings: $3,455 Cost: $3,500 |
- | - | $3,455 | 393 | - | - | - | - | - | - |
- - kWh |
$3,455 393 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,913 Cost: $260 |
$2,701 | 89,575 | $2,732 | 310 | - | - | - | - | $(-520) | - |
$2,701 89,575 kWh |
$2,732 310 kW-months/year |
- - MMBtu |
- - lb |
$(-520) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.3111 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE |
Savings: $1,056 Cost: - |
- | - | $1,056 | 120 | - | - | - | - | - | - |
- - kWh |
$1,056 120 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $3,177 Cost: $1,760 |
- | - | - | - | $3,177 | 497 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,177 497 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS |
Savings: $1,285 Cost: $30 |
- | - | - | - | - | - | $1,285 | 26,089 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,285 26,089 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $18,291 Cost: $19,117 |
$5,037 | 167,064 | $9,312 | 1,058 | $3,177 | 497 | $1,285 | 26,089 | $(-520) | - | $5,037 167,064 kWh |
$9,312 1,058 kW-months/year |
$3,177 497 MMBtu |
$1,285 26,089 lb |
$(-520) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $18,291 Cost: $19,117 |
$5,037 | 167,064 | $9,312 | 1,058 | $3,177 | 497 | $1,285 | 26,089 | $(-520) | - | $5,037 167,064 kWh |
$9,312 1,058 kW-months/year |
$3,177 497 MMBtu |
$1,285 26,089 lb |
$(-520) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |