IAC Assessment: UU0025
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0025
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2002
Principal Product Diamond Impregnated Drill Bits
NAICS n/a
SIC 3532 - Mining Machinery
Sales $50,000,000-$100,000,000
# of Employees 65
Plant Area (Sq.Ft.) 40,230
Annual Production 750,000 Pieces
Production Hrs. Annual 4,262
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $36,534 1,383,040 kWh $0.03
Electricity Demand $35,536 4,221 kW-months/year $8.42
Electricity Fees $9,348 - $ -
Natural Gas $29,464 4,724 MMBtu $6.24
TOTAL ENERGY COSTS $110,882
RECOMMENDED SAVINGS* $18,291 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,291
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,405
Cost:
$13,567
$2,336 77,489 $2,069 235 - - - - - - $2,336
77,489
kWh
$2,069
235
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,455
Cost:
$3,500
- - $3,455 393 - - - - - - -
-
kWh
$3,455
393
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,913
Cost:
$260
$2,701 89,575 $2,732 310 - - - - $(-520) - $2,701
89,575
kWh
$2,732
310
kW-months/year
-
-
MMBtu
-
-
lb
$(-520)
-
$
04: 2.3111 HEAT WATER DURING OFF-PEAK PERIODS AND STORE FOR LATER USE Savings:
$1,056
Cost:
-
- - $1,056 120 - - - - - - -
-
kWh
$1,056
120
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,177
Cost:
$1,760
- - - - $3,177 497 - - - - -
-
kWh
-
-
kW-months/year
$3,177
497
MMBtu
-
-
lb
-
-
$
06: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$1,285
Cost:
$30
- - - - - - $1,285 26,089 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,285
26,089
lb
-
-
$
TOTAL RECOMMENDED Savings:
$18,291
Cost:
$19,117
$5,037 167,064 $9,312 1,058 $3,177 497 $1,285 26,089 $(-520) - $5,037
167,064
kWh
$9,312
1,058
kW-months/year
$3,177
497
MMBtu
$1,285
26,089
lb
$(-520)
-
$
TOTAL IMPLEMENTED Savings:
$18,291
Cost:
$19,117
$5,037 167,064 $9,312 1,058 $3,177 497 $1,285 26,089 $(-520) - $5,037
167,064
kWh
$9,312
1,058
kW-months/year
$3,177
497
MMBtu
$1,285
26,089
lb
$(-520)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes