IAC logo
IAC Assessment: UU0027
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0027
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2002
Principal Product Irrgation Products
NAICS n/a
SIC 3342 -
Sales $10,000,000-$50,000,000
# of Employees 300
Plant Area (Sq.Ft.) 340,800
Annual Production 8,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $88,443 3,288,240 kWh $0.03
Electricity Demand $76,020 747 kW-months/year $101.77
Electricity Fees $28,577 - $ -
Natural Gas $66,005 11,655 MMBtu $5.66
TOTAL ENERGY COSTS $335,930
RECOMMENDED SAVINGS* $29,101 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,374
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,326
Cost:
$9,484
$4,309 134,709 $2,017 215 $4,309
134,709
kWh
$2,017
215
kW-months/year
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,774
Cost:
$180
$1,002 33,262 $772 88 $1,002
33,262
kWh
$772
88
kW-months/year
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$631
Cost:
$442
$364 11,644 $267 30 $364
11,644
kWh
$267
30
kW-months/year
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,600
Cost:
$4,500
- - $6,600 66 -
-
kWh
$6,600
66
kW-months/year
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,770
Cost:
$12,000
$9,380 293,268 $4,390 470 $9,380
293,268
kWh
$4,390
470
kW-months/year
TOTAL RECOMMENDED Savings:
$29,101
Cost:
$26,606
$15,055 472,883 $14,046 869 $15,055
472,883
kWh
$14,046
869
kW-months/year
TOTAL IMPLEMENTED Savings:
$8,374
Cost:
$4,680
$1,002 33,262 $7,372 154 $1,002
33,262
kWh
$7,372
154
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand