IAC logo
IAC Assessment: UU0030
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0030
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2002
Principal Product boxes
NAICS n/a
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $1,000,000-$5,000,000
# of Employees 38
Plant Area (Sq.Ft.) 35,000
Annual Production 29,000 Thousand Feet
Production Hrs. Annual 2,625
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $5,861 215,520 kWh $0.03
Electricity Demand $9,653 1,032 kW-months/year $9.35
Electricity Fees $3,264 - $ -
Natural Gas $8,004 1,326 MMBtu $6.04
TOTAL ENERGY COSTS $26,782
RECOMMENDED SAVINGS* $7,281 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,085
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,624
Cost:
$1,800
- - $1,624 15 - - -
-
kWh
$1,624
15
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,250
Cost:
$390
$460 14,300 $790 85 - - $460
14,300
kWh
$790
85
kW-months/year
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$379
Cost:
$240
$162 5,027 $217 23 - - $162
5,027
kWh
$217
23
kW-months/year
-
-
MMBtu
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$929
Cost:
$200
$(-106) (-3,288) $(-149) (-16) $1,184 215 $(-106)
(-3,288)
kWh
$(-149)
(-16)
kW-months/year
$1,184
215
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,080
Cost:
$1,843
$454 14,083 $626 66 - - $454
14,083
kWh
$626
66
kW-months/year
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$808
Cost:
-
$339 10,490 $469 50 - - $339
10,490
kWh
$469
50
kW-months/year
-
-
MMBtu
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,211
Cost:
$600
$508 15,735 $703 75 - - $508
15,735
kWh
$703
75
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$7,281
Cost:
$5,073
$1,817 56,347 $4,280 298 $1,184 215 $1,817
56,347
kWh
$4,280
298
kW-months/year
$1,184
215
MMBtu
TOTAL IMPLEMENTED Savings:
$4,085
Cost:
$2,790
$968 30,035 $3,117 175 - - $968
30,035
kWh
$3,117
175
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas