IAC logo
IAC Assessment: UU0040
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0040
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2003
Principal Product frozen dessert
NAICS 311520 - Ice Cream and Frozen Dessert Manufacturing
SIC 2024 - Ice Cream And Frozen Desserts
Sales <$500,000
# of Employees 11
Plant Area (Sq.Ft.) 0
Annual Production 3,000,000 Pieces
Production Hrs. Annual 2,284
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,128 113,679 kWh $0.03
Electricity Demand $3,917 492 kW-months/year $7.96
TOTAL ENERGY COSTS $7,045
RECOMMENDED SAVINGS* $5,451 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Demand Natural Gas Ancillary Material Cost Electricity Demand Natural Gas Ancillary Material Cost
$ kW-months/year $ MMBtu $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1
Cost:
-
$1 - - - - - $1
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$150
Cost:
-
- - - - $150 - -
-
kW-months/year
-
-
MMBtu
$150
-
$
03: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,957
Cost:
-
$2,957 336 - - - - $2,957
336
kW-months/year
-
-
MMBtu
-
-
$
04: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,285
Cost:
-
$2,285 180 - - - - $2,285
180
kW-months/year
-
-
MMBtu
-
-
$
05: 2.1231 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS Savings:
$1
Cost:
-
$1 - - - - - $1
-
kW-months/year
-
-
MMBtu
-
-
$
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$57
Cost:
$55
- - $57 14 - - -
-
kW-months/year
$57
14
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$5,451
Cost:
$55
$5,244 516 $57 14 $150 - $5,244
516
kW-months/year
$57
14
MMBtu
$150
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kW-months/year $ MMBtu $ $
Electricity Demand Natural Gas Ancillary Material Cost Electricity Demand Natural Gas Ancillary Material Cost