IAC logo
IAC Assessment: UU0041
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2003
Principal Product cable and wire
NAICS 311520 - Ice Cream and Frozen Dessert Manufacturing
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $10,000,000-$50,000,000
# of Employees 190
Plant Area (Sq.Ft.) 75,000
Annual Production 100,000 Pounds
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $428,947 15,464,800 kWh $0.03
Electricity Demand $284,180 384,192 kW-months/year $0.74
Natural Gas $74,597 17,019 MMBtu $4.38
TOTAL ENERGY COSTS $787,724
RECOMMENDED SAVINGS* $58,587 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$9,352
Cost:
$2,000
- - - - $9,352 2,302 -
-
kWh
-
-
kW-months/year
$9,352
2,302
MMBtu
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,207
Cost:
$3,500
- - - - $1,207 297 -
-
kWh
-
-
kW-months/year
$1,207
297
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,080
Cost:
$950
- - - - $1,080 265 -
-
kWh
-
-
kW-months/year
$1,080
265
MMBtu
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$31,340
Cost:
$45,900
- - $31,340 3,229 - - -
-
kWh
$31,340
3,229
kW-months/year
-
-
MMBtu
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$14,860
Cost:
-
- - $14,860 1,800 - - -
-
kWh
$14,860
1,800
kW-months/year
-
-
MMBtu
06: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$748
Cost:
-
$398 13,100 $350 42 - - $398
13,100
kWh
$350
42
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$58,587
Cost:
$52,350
$398 13,100 $46,550 5,071 $11,639 2,864 $398
13,100
kWh
$46,550
5,071
kW-months/year
$11,639
2,864
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas