IAC logo
IAC Assessment: UU0045
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0045
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2003
Principal Product pre cast concrete
NAICS 327332 - Concrete Pipe Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 75
Plant Area (Sq.Ft.) 0
Annual Production 80,000 Tons
Production Hrs. Annual 2,600
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,494 1,279,680 kWh $0.03
Electricity Demand $47,928 64,380 kW-months/year $0.74
Electricity Fees $4,636 - $ -
Natural Gas $97,381 20,378 MMBtu $4.78
TOTAL ENERGY COSTS $185,439
RECOMMENDED SAVINGS* $13,536 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,900
Cost:
-
- - $2,900 29 - - -
-
kWh
$2,900
29
kW-months/year
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,967
Cost:
-
- - $5,967 60 - - -
-
kWh
$5,967
60
kW-months/year
-
-
MMBtu
03: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,500
Cost:
$550
- - - - $1,500 389 -
-
kWh
-
-
kW-months/year
$1,500
389
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,090
Cost:
$886
- - - - $2,090 540 -
-
kWh
-
-
kW-months/year
$2,090
540
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,079
Cost:
$320
$413 13,600 $666 81 - - $413
13,600
kWh
$666
81
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$13,536
Cost:
$1,756
$413 13,600 $9,533 170 $3,590 929 $413
13,600
kWh
$9,533
170
kW-months/year
$3,590
929
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas