Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2004 |
Principal Product | joists |
NAICS | 332312 - Fabricated Structural Metal Manufacturing |
SIC | 3441 - Fabricated Structural Metal |
Sales | $50,000,000-$100,000,000 |
# of Employees | 295 |
Plant Area (Sq.Ft.) | 693,013 |
Annual Production | 150,000 Tons |
Production Hrs. Annual | 4,160 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $220,280 | 10,352,000 | kWh | $0.02 |
Electricity Demand | $213,493 | 35,464 | kW-months/year | $6.02 |
Electricity Fees | $17,147 | - | $ | - |
Natural Gas | $196,791 | 88,502 | MMBtu | $2.22 |
TOTAL ENERGY COSTS | $670,739 | |||
RECOMMENDED SAVINGS* | $110,757 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $27,337 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES |
Savings: $54,124 Cost: $150,000 |
- | - | - | - | - | - | $54,124 | 3,300 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$54,124 3,300 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $21,233 Cost: $78,000 |
$(-266) | (-12,071) | $(-131) | 21 | - | - | $21,630 | 5,054 | - | - |
$(-266) (-12,071) kWh |
$(-131) 21 kW-months/year |
- - $ |
$21,630 5,054 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $6,081 Cost: $5,369 |
- | - | - | - | - | - | $6,081 | 1,421 | - | - |
- - kWh |
- - kW-months/year |
- - $ |
$6,081 1,421 MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,398 Cost: $308 |
$768 | 34,924 | $630 | 101 | - | - | - | - | - | - |
$768 34,924 kWh |
$630 101 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,714 Cost: $1,010 |
$2,048 | 93,101 | $1,676 | 269 | - | - | - | - | $(-1,010) | - |
$2,048 93,101 kWh |
$1,676 269 kW-months/year |
- - $ |
- - MMBtu |
$(-1,010) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $14,353 Cost: - |
- | - | $14,353 | 2,304 | - | - | - | - | - | - |
- - kWh |
$14,353 2,304 kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.8112 COMBINE UTILITY METERS |
Savings: $10,270 Cost: - |
- | - | - | - | $10,270 | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,270 - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $584 Cost: - |
$584 | 26,520 | - | - | - | - | - | - | - | - |
$584 26,520 kWh |
- - kW-months/year |
- - $ |
- - MMBtu |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $110,757 Cost: $234,687 |
$3,134 | 142,474 | $16,528 | 2,695 | $10,270 | - | $81,835 | 9,775 | $(-1,010) | - | $3,134 142,474 kWh |
$16,528 2,695 kW-months/year |
$10,270 - $ |
$81,835 9,775 MMBtu |
$(-1,010) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $27,337 Cost: $1,010 |
$2,048 | 93,101 | $16,029 | 2,573 | $10,270 | - | - | - | $(-1,010) | - | $2,048 93,101 kWh |
$16,029 2,573 kW-months/year |
$10,270 - $ |
- - MMBtu |
$(-1,010) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Electricity Fees | Natural Gas | Administrative Changes |