Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2004 |
Principal Product | alarms light bars |
NAICS | 336390 - Other Motor Vehicle Parts Manufacturing |
SIC | 3714 - Motor Vehicle Parts And Accessories |
Sales | $10,000,000-$50,000,000 |
# of Employees | 133 |
Plant Area (Sq.Ft.) | 80,000 |
Annual Production | 6,500,000 Pieces |
Production Hrs. Annual | 4,160 |
Location (State) | ID |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $53,421 | 1,495,760 | kWh | $0.04 |
Electricity Demand | $8,654 | 3,170 | kW-months/year | $2.73 |
Electricity Fees | $2,477 | - | $ | - |
Natural Gas | $3,672 | 5,090 | MMBtu | $0.72 |
TOTAL ENERGY COSTS | $68,224 | |||
RECOMMENDED SAVINGS* | $36,817 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $625 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,895 Cost: $18,633 |
$2,390 | 73,100 | $505 | 211 | - | - |
$2,390 73,100 kWh |
$505 211 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $267 Cost: $1,000 |
$220 | 6,800 | $47 | 20 | - | - |
$220 6,800 kWh |
$47 20 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME |
Savings: $274 Cost: - |
$102 | 3,100 | $172 | 72 | - | - |
$102 3,100 kWh |
$172 72 kW-months/year |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.2111 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE |
Savings: $18,030 Cost: $11,000 |
- | - | - | - | $18,030 | - |
- - kWh |
- - kW-months/year |
$18,030 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.612 CONTRACT OUT MAINTENANCE |
Savings: $15,000 Cost: $2,000 |
- | - | - | - | $15,000 | - |
- - kWh |
- - kW-months/year |
$15,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $351 Cost: $432 |
- | - | - | - | $351 | - |
- - kWh |
- - kW-months/year |
$351 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $36,817 Cost: $33,065 |
$2,712 | 83,000 | $724 | 303 | $33,381 | - | $2,712 83,000 kWh |
$724 303 kW-months/year |
$33,381 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $625 Cost: $432 |
$102 | 3,100 | $172 | 72 | $351 | - | $102 3,100 kWh |
$172 72 kW-months/year |
$351 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost | Electricity Usage | Electricity Demand | One-time Revenue or Avoided Cost |