Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2004
Principal Product alarms light bars
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 133
Plant Area (Sq.Ft.) 80,000
Annual Production 6,500,000 Pieces
Production Hrs. Annual 4,160
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $53,421 1,495,760 kWh $0.04
Electricity Demand $8,654 3,170 kW-months/year $2.73
Electricity Fees $2,477 - $ -
Natural Gas $3,672 5,090 MMBtu $0.72
TOTAL ENERGY COSTS $68,224
RECOMMENDED SAVINGS* $36,817 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $625
#|Description Savings
Cost
Status Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,895
Cost:
$18,633
$2,390 73,100 $505 211 - - $2,390
73,100
kWh
$505
211
kW-months/year
-
-
$
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$267
Cost:
$1,000
$220 6,800 $47 20 - - $220
6,800
kWh
$47
20
kW-months/year
-
-
$
03: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$274
Cost:
-
$102 3,100 $172 72 - - $102
3,100
kWh
$172
72
kW-months/year
-
-
$
04: 3.2111 INSTALL REDUNDANT EQUIPMENT TO AVOID LOSSES CAUSED BY EQUIPMENT FAILURE AND ROUTINE MAINTENANCE Savings:
$18,030
Cost:
$11,000
- - - - $18,030 - -
-
kWh
-
-
kW-months/year
$18,030
-
$
05: 4.612 CONTRACT OUT MAINTENANCE Savings:
$15,000
Cost:
$2,000
- - - - $15,000 - -
-
kWh
-
-
kW-months/year
$15,000
-
$
06: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS Savings:
$351
Cost:
$432
- - - - $351 - -
-
kWh
-
-
kW-months/year
$351
-
$
TOTAL RECOMMENDED Savings:
$36,817
Cost:
$33,065
$2,712 83,000 $724 303 $33,381 - $2,712
83,000
kWh
$724
303
kW-months/year
$33,381
-
$
TOTAL IMPLEMENTED Savings:
$625
Cost:
$432
$102 3,100 $172 72 $351 - $102
3,100
kWh
$172
72
kW-months/year
$351
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand One-time Revenue or Avoided Cost Electricity Usage Electricity Demand One-time Revenue or Avoided Cost