IAC logo
IAC Assessment: UU0072
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0072
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2004
Principal Product Jet engines
NAICS 333611 - Turbine and Turbine Generator Set Units Manufacturing
SIC 3511 - Turbines And Turbine Generator Sets
Sales $100,000,000-$500,000,000
# of Employees 250
Plant Area (Sq.Ft.) 0
Annual Production 200 Pieces
Production Hrs. Annual 2,080
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $579,215 20,882,400 kWh $0.03
Electricity Demand $325,381 38,965 kW-months/year $8.35
Natural Gas $155,544 30,852 MMBtu $5.04
TOTAL ENERGY COSTS $1,060,140
RECOMMENDED SAVINGS* $289,340 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,050
Cost:
$21,660
- - $17,050 1,861 - - - - - - -
-
kWh
$17,050
1,861
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$10,670
Cost:
$10,000
- - $10,670 1,164 - - - - - - -
-
kWh
$10,670
1,164
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$16,150
Cost:
$17,500
- - - - $16,150 2,925 - - - - -
-
kWh
-
-
kW-months/year
$16,150
2,925
MMBtu
-
-
gal
-
-
$
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$6,450
Cost:
$8,500
- - - - $6,450 1,168 - - - - -
-
kWh
-
-
kW-months/year
$6,450
1,168
MMBtu
-
-
gal
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$940
Cost:
$600
$940 32,700 - - - - - - - - $940
32,700
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
06: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$203,380
Cost:
$800,000
- - - - - - - - $203,380 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$203,380
-
$
07: 3.5112 REPROCESS SPENT OILS ON SITE FOR RE-USE Savings:
$34,700
Cost:
$6,000
- - - - - - $34,700 3,762 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$34,700
3,762
gal
-
-
$
TOTAL RECOMMENDED Savings:
$289,340
Cost:
$864,260
$940 32,700 $27,720 3,025 $22,600 4,093 $34,700 3,762 $203,380 - $940
32,700
kWh
$27,720
3,025
kW-months/year
$22,600
4,093
MMBtu
$34,700
3,762
gal
$203,380
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Administrative Changes