IAC logo
IAC Assessment: UU0073
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0073
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2004
Principal Product electric signs
NAICS 339950 - Sign Manufacturing
SIC 3993 - Signs And Advertising Specialities
Sales $1,000,000-$5,000,000
# of Employees 78
Plant Area (Sq.Ft.) 54,229
Annual Production 150 Pieces
Production Hrs. Annual 2,560
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $31,255 722,200 kWh $0.04
Electricity Demand $25,891 3,046 kW-months/year $8.50
Natural Gas $26,053 4,644 MMBtu $5.61
TOTAL ENERGY COSTS $83,199
RECOMMENDED SAVINGS* $26,084 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ %
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$8,250
Cost:
$8,000
$(-460) (-10,000) $(-10) (-1) $8,720 1,410 - - - - - - $(-460)
(-10,000)
kWh
$(-10)
(-1)
kW-months/year
$8,720
1,410
MMBtu
-
-
lb
-
-
$
-
-
%
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,080
Cost:
$860
$610 13,390 $470 52 - - - - - - - - $610
13,390
kWh
$470
52
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
03: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$990
Cost:
$6,000
- - - - - - $990 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$990
-
lb
-
-
$
-
-
%
04: 3.5217 REUSE / RECYCLE/ SELL PAPER PRODUCTS Savings:
$2,434
Cost:
-
- - - - - - $2,434 24,600 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,434
24,600
lb
-
-
$
-
-
%
05: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$2,700
Cost:
$2,500
- - $2,700 300 - - - - - - - - -
-
kWh
$2,700
300
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
06: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$10,500
Cost:
$15,000
- - - - - - - - - - $10,500 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$10,500
-
%
07: 4.8110 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS Savings:
$130
Cost:
-
- - - - - - - - $130 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$130
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$26,084
Cost:
$32,360
$150 3,390 $3,160 351 $8,720 1,410 $3,424 24,600 $130 - $10,500 - $150
3,390
kWh
$3,160
351
kW-months/year
$8,720
1,410
MMBtu
$3,424
24,600
lb
$130
-
$
$10,500
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Administrative Changes Increase in Production