IAC logo
IAC Assessment: UU0076
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0076
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2004
Principal Product beverages
NAICS 311119 - Other Animal Food Manufacturing
SIC 2082 - Malt Beverages
Sales $10,000,000-$50,000,000
# of Employees 35
Plant Area (Sq.Ft.) 0
Annual Production 20,000 BBL
Production Hrs. Annual 2,040
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $11,805 413,810 kWh $0.03
Electricity Demand $14,470 1,669 kW-months/year $8.67
Natural Gas $20,920 4,011 MMBtu $5.22
TOTAL ENERGY COSTS $47,195
RECOMMENDED SAVINGS* $11,296 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,600
Cost:
$2,000
- - - - $1,600 286 - - -
-
kWh
-
-
kW-months/year
$1,600
286
MMBtu
-
-
Tgal
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$24
Cost:
$40
$24 730 - - - - - - $24
730
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$30
Cost:
-
$20 520 $10 1 - - - - $20
520
kWh
$10
1
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,300
Cost:
$4,824
$790 26,220 $1,510 151 - - - - $790
26,220
kWh
$1,510
151
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 3.4155 METER WASTE WATER Savings:
$5,360
Cost:
$1,500
- - - - - - $5,360 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,360
-
Tgal
06: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,982
Cost:
$2,220
- - $1,982 198 - - - - -
-
kWh
$1,982
198
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$11,296
Cost:
$10,584
$834 27,470 $3,502 350 $1,600 286 $5,360 - $834
27,470
kWh
$3,502
350
kW-months/year
$1,600
286
MMBtu
$5,360
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption