IAC logo
IAC Assessment: UU0078
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0078
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2004
Principal Product concrete precast
NAICS 327390 - Other Concrete Product Manufacturing
SIC 3272 - Concrete Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 146
Plant Area (Sq.Ft.) 4,800
Annual Production 90,000 Tons
Production Hrs. Annual 3,500
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $33,079 1,140,080 kWh $0.03
Electricity Demand $53,001 3,254 kW-months/year $16.29
Natural Gas $88,577 16,052 MMBtu $5.52
TOTAL ENERGY COSTS $174,657
RECOMMENDED SAVINGS* $38,725 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,135
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$6,850
Cost:
$10,000
- - $6,850 624 - - - - -
-
kWh
$6,850
624
kW-months/year
-
-
MMBtu
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,465
Cost:
$405
$1,138 35,249 $1,327 121 - - - - $1,138
35,249
kWh
$1,327
121
kW-months/year
-
-
MMBtu
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$4,890
Cost:
$4,820
- - - - $4,890 826 - - -
-
kWh
-
-
kW-months/year
$4,890
826
MMBtu
-
-
$
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,970
Cost:
$400
$890 27,600 $1,080 98 - - - - $890
27,600
kWh
$1,080
98
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$5,620
Cost:
$12,000
$(-260) (-8,000) $(-130) (-12) $6,010 1,016 - - $(-260)
(-8,000)
kWh
$(-130)
(-12)
kW-months/year
$6,010
1,016
MMBtu
-
-
$
06: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$5,720
Cost:
$1,120
- - - - - - $5,720 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,720
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,400
Cost:
$11,590
- - $10,400 947 - - - - -
-
kWh
$10,400
947
kW-months/year
-
-
MMBtu
-
-
$
08: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$810
Cost:
$450
- - - - - - $810 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$810
-
$
TOTAL RECOMMENDED Savings:
$38,725
Cost:
$40,785
$1,768 54,849 $19,527 1,778 $10,900 1,842 $6,530 - $1,768
54,849
kWh
$19,527
1,778
kW-months/year
$10,900
1,842
MMBtu
$6,530
-
$
TOTAL IMPLEMENTED Savings:
$10,135
Cost:
$6,075
$2,028 62,849 $2,407 219 $4,890 826 $810 - $2,028
62,849
kWh
$2,407
219
kW-months/year
$4,890
826
MMBtu
$810
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Ancillary Material Cost