IAC logo
IAC Assessment: UU0081
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0081
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2005
Principal Product cheese
NAICS 311513 - Cheese Manufacturing
SIC 2022 - Cheese, Natural And Processed
Sales $100,000,000-$500,000,000
# of Employees 99
Plant Area (Sq.Ft.) 69,200
Annual Production 216,000,000 Pounds
Production Hrs. Annual 3,120
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,245,080 45,071,782 kWh $0.03
Electricity Demand $195,594 70,529 kW-months/year $2.77
Natural Gas $300,000 493,848 MMBtu $0.61
TOTAL ENERGY COSTS $1,740,674
RECOMMENDED SAVINGS* $1,019,000 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,948
Cost:
$2,000
$7,992 293,269 $3,956 1,128 - - - - $7,992
293,269
kWh
$3,956
1,128
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,684
Cost:
$6,171
$1,127 41,335 $557 159 - - - - $1,127
41,335
kWh
$557
159
kW-months/year
-
-
MMBtu
-
-
Tgal
03: 2.4225 INSTALL COMMON HEADER ON COMPRESSORS Savings:
$1,717
Cost:
$1,270
$1,717 62,974 - - - - - - $1,717
62,974
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.4223 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM Savings:
$2,724
Cost:
$11,700
$1,824 67,032 $900 258 - - - - $1,824
67,032
kWh
$900
258
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,000
Cost:
$500
- - - - $4,000 7,079 - - -
-
kWh
-
-
kW-months/year
$4,000
7,079
MMBtu
-
-
Tgal
06: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$996,810
Cost:
$10,000,000
$870,310 31,082,500 $210,600 - $(-84,100) (-367,250) - - $870,310
31,082,500
kWh
$210,600
-
kW-months/year
$(-84,100)
(-367,250)
MMBtu
-
-
Tgal
07: 3.4156 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE Savings:
$117
Cost:
-
- - - - - - $117 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$117
-
Tgal
TOTAL RECOMMENDED Savings:
$1,019,000
Cost:
$10,021,641
$882,970 31,547,110 $216,013 1,545 $(-80,100) (-360,171) $117 - $882,970
31,547,110
kWh
$216,013
1,545
kW-months/year
$(-80,100)
(-360,171)
MMBtu
$117
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption