IAC logo
IAC Assessment: UU0099
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0099
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2006
Principal Product Cardboard box
NAICS 322211 - Corrugated and Solid Fiber Box Manufacturing
SIC 2653 - Corrugated And Solid Fiber Boxes
Sales $50,000,000-$100,000,000
# of Employees 150
Plant Area (Sq.Ft.) 385,526
Annual Production 1,140,371 Thousand Feet
Production Hrs. Annual 6,240
Location (State) ID
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,565 8,111,235 kWh $0.03
Electricity Demand $64,638 18,000 kW-months/year $3.59
Natural Gas $528,148 78,314 MMBtu $6.74
TOTAL ENERGY COSTS $832,351
RECOMMENDED SAVINGS* $75,339 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,880
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,650
Cost:
-
$2,340 79,060 $1,310 365 - - $2,340
79,060
kWh
$1,310
365
kW-months/year
-
-
MMBtu
02: 2.2522 ISOLATE HOT OR COLD EQUIPMENT Savings:
$1,350
Cost:
-
- - - - $1,350 230 -
-
kWh
-
-
kW-months/year
$1,350
230
MMBtu
03: 2.7313 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING Savings:
$36,960
Cost:
$164,490
- - - - $36,960 5,480 -
-
kWh
-
-
kW-months/year
$36,960
5,480
MMBtu
04: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$15,029
Cost:
$7,500
- - $15,029 3,600 - - -
-
kWh
$15,029
3,600
kW-months/year
-
-
MMBtu
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,100
Cost:
$21,000
- - - - $7,100 1,050 -
-
kWh
-
-
kW-months/year
$7,100
1,050
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,230
Cost:
$2,510
$2,720 92,170 $510 142 - - $2,720
92,170
kWh
$510
142
kW-months/year
-
-
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,020
Cost:
$14,000
- - $8,020 2,234 - - -
-
kWh
$8,020
2,234
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$75,339
Cost:
$209,500
$5,060 171,230 $24,869 6,341 $45,410 6,760 $5,060
171,230
kWh
$24,869
6,341
kW-months/year
$45,410
6,760
MMBtu
TOTAL IMPLEMENTED Savings:
$6,880
Cost:
$2,510
$5,060 171,230 $1,820 507 - - $5,060
171,230
kWh
$1,820
507
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas