IAC logo
IAC Assessment: UU0102
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0102
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2006
Principal Product Aluminum Parts
NAICS 331318 - Other Aluminum Rolling, Drawing, and Extruding
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 250
Plant Area (Sq.Ft.) 363,800
Annual Production 14,000,000 Pounds
Production Hrs. Annual 4,160
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $64,500 958,680 kWh $0.07
Electricity Demand $70,951 6,740 kW-months/year $10.53
Natural Gas $327,108 43,052 MMBtu $7.60
TOTAL ENERGY COSTS $462,559
RECOMMENDED SAVINGS* $123,630 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $114,100
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$88,420
Cost:
$3,500
$2,020 72,770 - - - - $86,400 - $2,020
72,770
kWh
-
-
kW-months/year
-
-
MMBtu
$86,400
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,430
Cost:
$4,040
$1,230 44,070 $1,200 128 - - - - $1,230
44,070
kWh
$1,200
128
kW-months/year
-
-
MMBtu
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$540
Cost:
$620
$370 13,390 $170 18 - - - - $370
13,390
kWh
$170
18
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$23,250
Cost:
$8,290
- - - - $23,250 2,878 - - -
-
kWh
-
-
kW-months/year
$23,250
2,878
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,990
Cost:
$78,390
$4,590 165,000 $4,400 468 - - - - $4,590
165,000
kWh
$4,400
468
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$123,630
Cost:
$94,840
$8,210 295,230 $5,770 614 $23,250 2,878 $86,400 - $8,210
295,230
kWh
$5,770
614
kW-months/year
$23,250
2,878
MMBtu
$86,400
-
$
TOTAL IMPLEMENTED Savings:
$114,100
Cost:
$15,830
$3,250 116,840 $1,200 128 $23,250 2,878 $86,400 - $3,250
116,840
kWh
$1,200
128
kW-months/year
$23,250
2,878
MMBtu
$86,400
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes