IAC Assessment: UU0104
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0104
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2006
Principal Product bridges
NAICS 333924 - Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing
SIC 3537 - Industrial Trucks And Tractors
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 350,000
Annual Production 200 Pieces
Production Hrs. Annual 2,210
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $102,927 4,161,600 kWh $0.02
Electricity Demand $109,415 13,139 kW-months/year $8.33
Natural Gas $360,176 39,969 MMBtu $9.01
TOTAL ENERGY COSTS $572,518
RECOMMENDED SAVINGS* $358,770 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $
01: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$19,040
Cost:
$10,000
- - $19,040 2,496 - - - - - - -
-
kWh
$19,040
2,496
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
02: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$2,420
Cost:
$2,000
$790 32,215 - - - - - - $1,630 - $790
32,215
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$1,630
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$15,540
Cost:
$3,530
$10,110 411,510 $5,430 712 - - - - - - $10,110
411,510
kWh
$5,430
712
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
04: 2.2314 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT Savings:
$104,490
Cost:
$16,800
- - - - - - $104,490 12,675 - - -
-
kWh
-
-
kW-months/year
-
-
$
$104,490
12,675
MMBtu
-
-
$
05: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$198,120
Cost:
$1,974,210
$125,000 4,161,600 $125,000 13,139 $6,586 - $(-58,466) (-6,439) - - $125,000
4,161,600
kWh
$125,000
13,139
kW-months/year
$6,586
-
$
$(-58,466)
(-6,439)
MMBtu
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$15,650
Cost:
$28,400
$(-620) (-25,380) $(-530) (-70) - - $16,800 2,038 - - $(-620)
(-25,380)
kWh
$(-530)
(-70)
kW-months/year
-
-
$
$16,800
2,038
MMBtu
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,510
Cost:
$8,490
- - $3,510 460 - - - - - - -
-
kWh
$3,510
460
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$358,770
Cost:
$2,043,430
$135,280 4,579,945 $152,450 16,737 $6,586 - $62,824 8,274 $1,630 - $135,280
4,579,945
kWh
$152,450
16,737
kW-months/year
$6,586
-
$
$62,824
8,274
MMBtu
$1,630
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes