IAC Assessment: UU0105
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0105
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2006
Principal Product Cabinetry
NAICS 337110 - Wood Kitchen Cabinet and Countertop Manufacturing
SIC 2434 - Wood Kitchen Cabinets
Sales $10,000,000-$50,000,000
# of Employees 242
Plant Area (Sq.Ft.) 132,000
Annual Production 130,000 Pieces
Production Hrs. Annual 6,630
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,515 1,343,574 kWh $0.04
Electricity Demand $50,684 7,533 kW-months/year $6.73
Natural Gas $53,000 6,118 MMBtu $8.66
TOTAL ENERGY COSTS $154,199
RECOMMENDED SAVINGS* $48,010 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$6,120
Cost:
$8,220
- - $6,120 746 - - - - - - -
-
kWh
$6,120
746
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$6,370
Cost:
-
- - $6,370 588 - - - - - - -
-
kWh
$6,370
588
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,340
Cost:
$3,385
$4,000 142,480 $3,340 288 - - - - - - $4,000
142,480
kWh
$3,340
288
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,620
Cost:
$430
$1,970 70,130 $1,650 142 - - - - - - $1,970
70,130
kWh
$1,650
142
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$440
Cost:
$170
$300 10,730 $140 12 - - - - - - $300
10,730
kWh
$140
12
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$3,000
Cost:
$2,300
$3,000 106,700 - - - - - - - - $3,000
106,700
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,980
Cost:
$4,365
- - - - $5,980 688 - - - - -
-
kWh
-
-
kW-months/year
$5,980
688
MMBtu
-
-
$
-
-
$
08: 3.1291 ELIMINATE PRACTICE OF MIXING WASTE STREAMS Savings:
$15,140
Cost:
$40,000
$(-2,400) (-85,550) $(-2,700) (-232) - - $12,960 - $7,280 - $(-2,400)
(-85,550)
kWh
$(-2,700)
(-232)
kW-months/year
-
-
MMBtu
$12,960
-
$
$7,280
-
$
TOTAL RECOMMENDED Savings:
$48,010
Cost:
$58,870
$6,870 244,490 $14,920 1,544 $5,980 688 $12,960 - $7,280 - $6,870
244,490
kWh
$14,920
1,544
kW-months/year
$5,980
688
MMBtu
$12,960
-
$
$7,280
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Administrative Changes Ancillary Material Cost