IAC logo
IAC Assessment: UU0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2006
Principal Product Aircraft Parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 160
Plant Area (Sq.Ft.) 80,000
Annual Production 0 Units
Production Hrs. Annual 8,736
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $169,017 6,857,400 kWh $0.02
Electricity Demand $210,741 18,908 kW-months/year $11.15
TOTAL ENERGY COSTS $421,002
RECOMMENDED SAVINGS* $101,760 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$19,900
Cost:
$40,020
- - $19,900 1,549 - - -
-
kWh
$19,900
1,549
kW-months/year
-
-
Tgal
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$43,630
Cost:
$20,000
- - $43,630 3,396 - - -
-
kWh
$43,630
3,396
kW-months/year
-
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,510
Cost:
$3,780
$4,830 174,480 $3,680 287 - - $4,830
174,480
kWh
$3,680
287
kW-months/year
-
-
Tgal
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$6,120
Cost:
$4,000
$3,230 116,840 $2,890 225 - - $3,230
116,840
kWh
$2,890
225
kW-months/year
-
-
Tgal
05: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$23,010
Cost:
$7,390
$(-330) (-11,910) $(-210) (-16) $23,550 13,689,820 $(-330)
(-11,910)
kWh
$(-210)
(-16)
kW-months/year
$23,550
13,689,820
Tgal
06: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED Savings:
$590
Cost:
$500
$360 13,140 $230 18 - - $360
13,140
kWh
$230
18
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$101,760
Cost:
$75,690
$8,090 292,550 $70,120 5,459 $23,550 13,689,820 $8,090
292,550
kWh
$70,120
5,459
kW-months/year
$23,550
13,689,820
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal