IAC logo
IAC Assessment: UU0109
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0109
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2006
Principal Product Medica C-Arms
NAICS 334517 - Irradiation Apparatus Manufacturing
SIC 3844 - X-ray Apparatus And Tubes
Sales $100,000,000-$500,000,000
# of Employees 440
Plant Area (Sq.Ft.) 185,000
Annual Production 5,300 Pieces
Production Hrs. Annual 4,198
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $108,616 4,154,820 kWh $0.03
Electricity Demand $116,656 10,421 kW-months/year $11.19
Natural Gas $26,323 3,742 MMBtu $7.03
TOTAL ENERGY COSTS $251,595
RECOMMENDED SAVINGS* $67,320 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,800
Cost:
$2,220
- - $1,800 151 - - -
-
kWh
$1,800
151
kW-months/year
-
-
$
02: 2.3191 USE DEMAND CONTROLLER OR LOAD SHEDDER Savings:
$24,880
Cost:
$20,000
- - $24,880 2,088 - - -
-
kWh
$24,880
2,088
kW-months/year
-
-
$
03: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,730
Cost:
$970
$2,570 85,872 $1,160 98 - - $2,570
85,872
kWh
$1,160
98
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,040
Cost:
$90
$300 9,990 $740 62 - - $300
9,990
kWh
$740
62
kW-months/year
-
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$3,360
Cost:
$2,960
$3,360 112,200 - - - - $3,360
112,200
kWh
-
-
kW-months/year
-
-
$
06: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$32,510
Cost:
$249,000
$20,870 696,690 - - $11,640 - $20,870
696,690
kWh
-
-
kW-months/year
$11,640
-
$
TOTAL RECOMMENDED Savings:
$67,320
Cost:
$275,240
$27,100 904,752 $28,580 2,399 $11,640 - $27,100
904,752
kWh
$28,580
2,399
kW-months/year
$11,640
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes