IAC logo
IAC Assessment: UU0114
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0114
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2017
Principal Product Bread and Bread Products
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 222
Plant Area (Sq.Ft.) 117,000
Annual Production 93,263,418 Pounds
Production Hrs. Annual 8,712
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $223,177 6,149,531 kWh $0.04
Electricity Demand $156,101 12,532 kW-months/year $12.46
Electricity Fees $124,508 - $ -
Natural Gas $155,886 52,247 MMBtu $2.98
TOTAL ENERGY COSTS $659,671
RECOMMENDED SAVINGS* $63,689 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $46,485
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,236
Cost:
$180
$4,236 89,681 - - - - - - $4,236
89,681
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$14,409
Cost:
$30,000
- - - - $14,409 - - - -
-
kWh
-
-
kW-months/year
$14,409
-
$
-
-
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$18,931
Cost:
-
- - - - - - $18,931 6,344 -
-
kWh
-
-
kW-months/year
-
-
$
$18,931
6,344
MMBtu
04: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$2,795
Cost:
$1,315
- - - - - - $2,795 937 -
-
kWh
-
-
kW-months/year
-
-
$
$2,795
937
MMBtu
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,973
Cost:
$39,045
$17,024 469,082 $717 58 $233 - - - $17,024
469,082
kWh
$717
58
kW-months/year
$233
-
$
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,345
Cost:
-
$5,081 140,014 $199 16 $65 - - - $5,081
140,014
kWh
$199
16
kW-months/year
$65
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$63,689
Cost:
$70,540
$26,341 698,777 $916 74 $14,706 - $21,726 7,281 $26,341
698,777
kWh
$916
74
kW-months/year
$14,706
-
$
$21,726
7,281
MMBtu
TOTAL IMPLEMENTED Savings:
$46,485
Cost:
$39,225
$26,341 698,777 $916 74 $297 - $18,931 6,344 $26,341
698,777
kWh
$916
74
kW-months/year
$297
-
$
$18,931
6,344
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas