IAC logo
IAC Assessment: UU0122
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0122
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2017
Principal Product Roofing Material
NAICS 326140 - Polystyrene Foam Product Manufacturing
SIC 3086 - Plastics Foam Products
Sales $1,000,000-$5,000,000
# of Employees 60
Plant Area (Sq.Ft.) 500,000
Annual Production 1,250 Thousand Feet
Production Hrs. Annual 8,736
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $384,394 10,234,800 kWh $0.04
Electricity Demand $325,046 24,900 kW-months/year $13.05
Electricity Fees $239,422 - $ -
Natural Gas $61,018 11,815 MMBtu $5.16
TOTAL ENERGY COSTS $1,009,880
RECOMMENDED SAVINGS* $297,736 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,707
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$204,798
Cost:
-
- - $129,648 9,936 $75,150 - - - -
-
kWh
$129,648
9,936
kW-months/year
$75,150
-
$
-
-
MMBtu
02: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$55,559
Cost:
$500
- - - - $55,559 - - - -
-
kWh
-
-
kW-months/year
$55,559
-
$
-
-
MMBtu
03: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$15,162
Cost:
$26,440
- - - - - - $15,162 2,936 -
-
kWh
-
-
kW-months/year
-
-
$
$15,162
2,936
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$7,349
Cost:
$800
$1,984 52,208 $3,932 301 $1,434 - - - $1,984
52,208
kWh
$3,932
301
kW-months/year
$1,434
-
$
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,799
Cost:
$4,244
$6,799 178,926 - - - - - - $6,799
178,926
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$5,324
Cost:
$11,240
$(-414) 10,893 $(-195) 15 $(-71) - $6,004 1,163 $(-414)
10,893
kWh
$(-195)
15
kW-months/year
$(-71)
-
$
$6,004
1,163
MMBtu
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$2,745
Cost:
-
$1,054 27,742 $1,239 95 $452 - - - $1,054
27,742
kWh
$1,239
95
kW-months/year
$452
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$297,736
Cost:
$43,224
$9,423 269,769 $134,624 10,347 $132,524 - $21,165 4,099 $9,423
269,769
kWh
$134,624
10,347
kW-months/year
$132,524
-
$
$21,165
4,099
MMBtu
TOTAL IMPLEMENTED Savings:
$69,707
Cost:
$5,544
$8,783 231,134 $3,932 301 $56,993 - - - $8,783
231,134
kWh
$3,932
301
kW-months/year
$56,993
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas