IAC logo
IAC Assessment: UU0125
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0125
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2017
Principal Product Carbon Fiber, Synthetic Resins, Prepreg Material
NAICS 335991 - Carbon and Graphite Product Manufacturing
SIC 2824 - Organic Fibers, Noncellulosic
Sales $100,000,000-$500,000,000
# of Employees 423
Plant Area (Sq.Ft.) 200,000
Annual Production 3,250,000 Pounds
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $910,959 27,854,237 kWh $0.03
Electricity Demand $41,677 3,571 kW-months/year $11.67
Electricity Fees $282,474 - $ -
Natural Gas $401,529 135,797 MMBtu $2.96
TOTAL ENERGY COSTS $2,475,418
RECOMMENDED SAVINGS* $71,175 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,156
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Solid Waste (non-haz)
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb
01: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$32,802
Cost:
-
$25,275 772,929 $13,562 1,162 $2,581 - $(-8,615) (-2,930) - - - - $25,275
772,929
kWh
$13,562
1,162
kW-months/year
$2,581
-
$
$(-8,615)
(-2,930)
MMBtu
-
-
Tgal
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,851
Cost:
$18,588
$6,227 190,456 $3,624 261 - - - - - - - - $6,227
190,456
kWh
$3,624
261
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$7,110
Cost:
$20
$3,778 115,536 $2,799 240 $533 - - - - - - - $3,778
115,536
kWh
$2,799
240
kW-months/year
$533
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$6,187
Cost:
$3,150
- - - - - - - - - - $6,187 184,024 -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
$6,187
184,024
lb
05: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$5,417
Cost:
$39,198
$1,459 44,208 $3,958 339 - - - - - - - - $1,459
44,208
kWh
$3,958
339
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$4,418
Cost:
$7,220
$4,418 135,121 - - - - - - - - - - $4,418
135,121
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
Tgal
-
-
lb
07: 3.4151 MINIMIZE WATER USAGE Savings:
$3,700
Cost:
$200
- - - - - - - - $3,700 3,150 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$3,700
3,150
Tgal
-
-
lb
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$1,690
Cost:
-
$268 8,186 - - - - $1,422 484 - - - - $268
8,186
kWh
-
-
kW-months/year
-
-
$
$1,422
484
MMBtu
-
-
Tgal
-
-
lb
TOTAL RECOMMENDED Savings:
$71,175
Cost:
$68,376
$41,424 1,266,436 $23,943 2,002 $3,114 - $(-7,193) (-2,447) $3,700 3,150 $6,187 184,024 $41,424
1,266,436
kWh
$23,943
2,002
kW-months/year
$3,114
-
$
$(-7,193)
(-2,447)
MMBtu
$3,700
3,150
Tgal
$6,187
184,024
lb
TOTAL IMPLEMENTED Savings:
$24,156
Cost:
$29,158
$10,645 325,577 $3,624 261 - - - - $3,700 3,150 $6,187 184,024 $10,645
325,577
kWh
$3,624
261
kW-months/year
-
-
$
-
-
MMBtu
$3,700
3,150
Tgal
$6,187
184,024
lb
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Solid Waste (non-haz) Electricity Usage Electricity Demand Electricity Fees Natural Gas Water Usage Solid Waste (non-haz)