IAC logo
IAC Assessment: UU0142
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UU0142
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Utah
Assessment Year 2019
Principal Product Composite Parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 110
Plant Area (Sq.Ft.) 101,500
Annual Production 3,140 Pieces
Production Hrs. Annual 8,760
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,553 2,503,839 kWh $0.04
Electricity Demand $78,586 4,695 kW-months/year $16.74
Electricity Fees $34,066 - $ -
Natural Gas $29,330 3,651 MMBtu $8.03
TOTAL ENERGY COSTS $233,535
RECOMMENDED SAVINGS* $23,670 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,461
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$10,657
Cost:
$600
- - - - $10,657 - -
-
kWh
-
-
kW-months/year
$10,657
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,981
Cost:
$14,585
$4,024 109,639 $2,957 177 - - $4,024
109,639
kWh
$2,957
177
kW-months/year
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$1,742
Cost:
$2,500
- - - - $1,742 - -
-
kWh
-
-
kW-months/year
$1,742
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,661
Cost:
-
$1,022 27,857 $638 38 - - $1,022
27,857
kWh
$638
38
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,532
Cost:
-
$1,532 41,750 - - - - $1,532
41,750
kWh
-
-
kW-months/year
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$810
Cost:
$129
$498 13,578 $311 19 - - $498
13,578
kWh
$311
19
kW-months/year
-
-
$
07: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$288
Cost:
$100
$213 5,742 $75 4 - - $213
5,742
kWh
$75
4
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$23,670
Cost:
$17,914
$7,290 198,566 $3,981 238 $12,399 - $7,290
198,566
kWh
$3,981
238
kW-months/year
$12,399
-
$
TOTAL IMPLEMENTED Savings:
$10,461
Cost:
$14,685
$6,791 184,988 $3,670 219 - - $6,791
184,988
kWh
$3,670
219
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees