Select a Center

Arizona State University
Boise State University
Case Western Reserve University
Clemson University
Colorado State University
Georgia Institute of Technology
Indiana University-Purdue University
Lehigh University
Louisiana State University
North Carolina State
Oklahoma State University
Oregon State University
San Diego State University
San Francisco State University
Syracuse University
Tennessee Technological University
Texas A&M, College Station
University of Alabama
University of Dayton
University of Delaware
University of Florida
University of Illinois, Chicago
University of Kentucky
University of Massachusetts
University of Miami
University of Missouri-Columbia
University of Nebraska–Lincoln
University of Texas Rio Grande Valley
University of Utah
University of Wisconsin, Milwaukee
West Virginia University
IAC logo
IAC Assessment: UU0158
Sponsored by:
EERE AMO
IAC logo
IAC Assessment: UU0158
IAC Center University of Utah
Assessment Year 2019
Principal Product Beer
NAICS 312120 - Breweries
SIC 2082 - Malt Beverages
Sales $600,000
# of Employees 17
Plant Area (Sq.Ft.) 37,000
Annual Production 3,000 BBL
Production Hrs. Annual 1,872
Location (State) UT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $5,589 152,880 kWh $0.04
Electricity Demand $8,930 545 kW/month $16.39
Natural Gas $18,090 2,690 MMBtu $6.73
TOTAL ENERGY COSTS $39,543
RECOMMENDED SAVINGS* $13,412 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Gaseous Waste Personnel Changes Electricity Usage Electricity Demand Natural Gas Gaseous Waste Personnel Changes
$ kWh $ kW/month $ MMBtu $ lb $ $
01: 3.1174 USE A RECYCLED RAW MATERIAL Savings:
$6,933
Cost:
$50,000
- - - - - - $6,933 26,000 - - -
-
kWh
-
-
kW/month
-
-
MMBtu
$6,933
26,000
lb
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,811
Cost:
$160
- - - - $2,811 418 - - - - -
-
kWh
-
-
kW/month
$2,811
418
MMBtu
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,726
Cost:
$2,762
$743 20,072 $901 55 - - - - $82 - $743
20,072
kWh
$901
55
kW/month
-
-
MMBtu
-
-
lb
$82
-
$
04: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$740
Cost:
$800
- - - - $740 110 - - - - -
-
kWh
-
-
kW/month
$740
110
MMBtu
-
-
lb
-
-
$
05: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT Savings:
$451
Cost:
$1,100
$451 12,190 - - - - - - - - $451
12,190
kWh
-
-
kW/month
-
-
MMBtu
-
-
lb
-
-
$
06: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$445
Cost:
-
- - - - - - $445 1,711 - - -
-
kWh
-
-
kW/month
-
-
MMBtu
$445
1,711
lb
-
-
$
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$306
Cost:
$260
$306 8,275 - - - - - - - - $306
8,275
kWh
-
-
kW/month
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$13,412
Cost:
$55,082
$1,500 40,537 $901 55 $3,551 528 $7,378 27,711 $82 - $1,500
40,537
kWh
$901
55
kW/month
$3,551
528
MMBtu
$7,378
27,711
lb
$82
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW/month
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW/month $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Gaseous Waste Personnel Changes Electricity Usage Electricity Demand Natural Gas Gaseous Waste Personnel Changes