Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Utah |
---|---|
Assessment Year | 2019 |
Principal Product | Beer |
NAICS | 312120 - Breweries |
SIC | 2082 - Malt Beverages |
Sales | $500,000-$1,000,000 |
# of Employees | 17 |
Plant Area (Sq.Ft.) | 37,000 |
Annual Production | 3,000 BBL |
Production Hrs. Annual | 1,872 |
Location (State) | UT |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $5,589 | 152,880 | kWh | $0.04 |
Electricity Demand | $8,930 | 545 | kW-months/year | $16.39 |
Natural Gas | $18,090 | 2,690 | MMBtu | $6.73 |
TOTAL ENERGY COSTS | $39,543 | |||
RECOMMENDED SAVINGS* | $13,412 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,928 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Gaseous Waste | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Gaseous Waste | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.1175 USE A DIFFERENT OR RECYCLED RAW MATERIAL |
Savings: $6,933 Cost: $50,000 |
- | - | - | - | - | - | $6,933 | 26,000 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$6,933 26,000 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,811 Cost: $160 |
- | - | - | - | $2,811 | 418 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,811 418 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,726 Cost: $2,762 |
$743 | 20,072 | $901 | 55 | - | - | - | - | $82 | - |
$743 20,072 kWh |
$901 55 kW-months/year |
- - MMBtu |
- - lb |
$82 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS |
Savings: $740 Cost: $800 |
- | - | - | - | $740 | 110 | - | - | - | - |
- - kWh |
- - kW-months/year |
$740 110 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 4.661 LEVEL ZERO – INSTALL CONTROL SYSTEMS FOR EXISTING EQUIPMENT |
Savings: $451 Cost: $1,100 |
$451 | 12,190 | - | - | - | - | - | - | - | - |
$451 12,190 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.1161 ELIMINATE/REDUCE AN OPERATION |
Savings: $445 Cost: - |
- | - | - | - | - | - | $445 | 1,711 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$445 1,711 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $306 Cost: $260 |
$306 | 8,275 | - | - | - | - | - | - | - | - |
$306 8,275 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $13,412 Cost: $55,082 |
$1,500 | 40,537 | $901 | 55 | $3,551 | 528 | $7,378 | 27,711 | $82 | - | $1,500 40,537 kWh |
$901 55 kW-months/year |
$3,551 528 MMBtu |
$7,378 27,711 lb |
$82 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,928 Cost: $4,122 |
$1,500 | 40,537 | $901 | 55 | - | - | $445 | 1,711 | $82 | - | $1,500 40,537 kWh |
$901 55 kW-months/year |
- - MMBtu |
$445 1,711 lb |
$82 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Gaseous Waste | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Gaseous Waste | Personnel Changes |